← Library
Patna High CourtCWJC/1927/2020withdrawn

Nalanda Engicon Pvt. Ltd. (Jv) v. The State Of Bihar

2020-02-25Mr. Justice Ashutosh Kumar2 pages

IN THE HIGH COURT OF JUDICATURE AT PATNA

Civil Writ Jurisdiction Case No.1927 of 2020 ====================================================== Nalanda Engicon Pvt. Ltd. (JV) through its authorized signatory Bibekanand Kumar, Male aged about 42 years, son of Late Sachidanand Prasad having its Registered Office at 14, Shri Ram Tower, West of Jalan Shop, Main Road, Kankarbagh, P.S.- Kankarbagh, District- Patna. ... ... Petitioner/s

Versus

1.

The State of Bihar through the Principal Secretary, Urban Development Department, Government of Bihar, Patna.

2.

Bihar Urban Infrastructure Development Corporation Ltd. (BUIDCO), through its Managing Director, West Boring Canal Road, Near Rajapur Pul, P.s.-North S.K. Puri, Patna.

3.

The Managing Director, Bihar Urban Infrastructure Development Corporation Ltd. (BUIDCO), West Boring Canal Road, Near Rajapur Pul, P.s.-North S.K. Puri, Patna.

4.

The Executive Engineer, Bihar Urban Infrastructure Development Corporation Ltd. (BUIDCO), Jehanabad.

5.

M/s SPML Infra Ltd. -KIIPL (JV) through its Authorized Signatory Mr. Anupam Kumar, having its office at 3rd Floor, A Block, Camac Street, Kolkata-700016.

... ... Respondent/s ====================================================== Appearance :

For the Petitioner/s :

Mr. Shekhar Singh, ADv.

For the Respondent/s :

Mr. Rajiv Roy (GP-1) ====================================================== CORAM: HONOURABLE MR. JUSTICE ASHUTOSH KUMAR ORAL ORDER 25-02-2020 Mr. Shekhar Singh, learned Advocate for the

Patna High Court CWJC No.1927 of 2020(2) dt.25-02-2020 2/2 petitioner, after some arguments, seeks permission to withdraw this petition in order to enable the petitioner to prefer a representation before the Bihar Urban Infrastructure Development Corporation Ltd. (BUIDCO) staking its claim for being chosen as a concessionaire as the earlier noncompletion of work within the stipulated time is not attributable to the petitioner.

2. Should such a representation be filed within a reasonable period of time, preferably within a period of two weeks, this Court would expect that the BUIDCO would look into the aforesaid representation in a holistic manner and shall communicate to the petitioner the reasons for either accepting or rejecting such representation.

3. Dismissed as withdrawn with the liberty aforesaid.

(Ashutosh Kumar, J) Praveen-II/- U