Patna High CourtCWJC/3472/2019disposed

Lal Bahadur Singh v. The State Of Bihar And ORS

2019-02-25Mr. Justice Ashutosh Kumar2 pages

IN THE HIGH COURT OF JUDICATURE AT PATNA

Civil Writ Jurisdiction Case No.3472 of 2019 ====================================================== Lal Bahadur Singh S/o Late Tarini Pd. Singh Vill.-Kheran Mallik, Po- Khuran Mallik, Ps.-Alam Nagar, Distt.-Madhepura ... ... Petitioner/s

Versus

1. The State of Bihar through its Chief Secretary, Bihar, Patna

2. Finance Commissioner Bihar, Patna

3. Accountant General Bihar, Patna

4. Principal Secretary Building Construction Department, Bihar, Patna

5. Collector Saharsa

6. Chief Engineer Building Construction Department, Bihar, Patna

7. Superintending Engineer Building Construction Department, Bihar, Patna

8. Executive Engineer Building Construction Department, Bihar, Patna

9. Accountant Rural Works Department, Saharsa

10. Establishment Clerk Building Construction Department, Saharsa

11. Treasury Officer Saharsa ... ... Respondent/s ====================================================== Appearance :

For the Petitioner/s :

Mr. Mallika Mazumdar Advocate For the Respondent/s :

Mr. Amit Prakash GA13 Mr. Ravi Bhardwaj Advocate For the Accountant General:

Mr. Ranjan Kumar Advocate ====================================================== CORAM: HONOURABLE MR. JUSTICE ASHUTOSH KUMAR ORAL JUDGMENT Date : 25-02-2019 Heard the learned counsel for the petitioner and the State.

The petitioner seeks a direction to the respondents / authorities to pay him his arrears of salary w.e.f. 15.04.2000 to 28.02.2014 which has already been allotted but for reasons not known to the petitioner, the same has not been given to

Patna High Court CWJC No.3472 of 2019 dt.25-02-2019 2/2 him. Several representations also have been filed by the petitioner before the Executive Engineer, Building Division, Saharsa but to no avail.

The petitioner in the aforesaid circumstances is directed to make a fresh representation before the Executive Engineer, Building Construction Department, Division, Saharsa within a period of two weeks from today along with a copy of this order. On receipt of such representation, the concerned respondent shall dispose off the same by a reasoned order within a period of three weeks thereafter. In case the claim of the petitioner is found to be tenable, there is no reason why necessary sequel order ought not to be passed within the aforesaid period as directed by this Court.

With the aforesaid observation / direction, this petition stands disposed off.

(Ashutosh Kumar, J) skm/- AFR/NAFR N.A.F.R.

CAV DATE Uploading Date 26.02.2019 Transmission Date