Ms Pooja Construction v. Union Of India And ANR
$~120 * IN THE HIGH COURT OF DELHI AT NEW DELHI + W.P.(C) 6678/2024 MS POOJA CONSTRUCTION .....Petitioner Through:
Ms. Risha Mittal, Mr. Rohan Narula, Mr. Sanchit Gupta and Md. Adil Alam, Advs.
versus UNION OF INDIA AND ANR .....Respondents Through:
Ms. Rukhnimi Bobde, CGSC, Mr.
Hussain Taqvi, GP, Mr. Amlaan Kumar, Mr. Vinayak Aren, Advs. for UOI.
CORAM:
HON'BLE MR. JUSTICE SACHIN DATTA % 17.03.2025
O R D E R
CM APPL.15500/2025 (filed on behalf of the petitioner seeking withdrawal of petition) 1.
Learned counsel for the petitioner submits that the relevant Work Load Return/s (WLR), issued by the respondents and with which the petitioner is aggrieved, have been impugned in arbitration proceedings, initiated on the basis of the arbitration agreement incorporated in the contract between the parties. As such, the petitioner seeks to withdraw the present petition.
2.
In the circumstances, the present application is allowed. 3.
W.P.(C) 6678/2024 is consequently, dismissed as withdrawn. W.P.(C) 6678/2024 The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above. The Order is downloaded from the DHC Server on 24/03/2025 at 14:38:46
4.
The date fixed i.e. 14.07.2025 stands cancelled. SACHIN DATTA, J MARCH 17, 2025/cl The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above. The Order is downloaded from the DHC Server on 24/03/2025 at 14:38:46