Ktech Engineer Builders Co. Pvt. Ltd v. Union Of India
$~26 * IN THE HIGH COURT OF DELHI AT NEW DELHI + O.M.P.(MISC.)(COMM.) 752/2024 &I.A. 40322/2024 KTECH ENGINEER BUILDERS CO. PVT. LTD. .....Petitioner Through:
Mr.
Nikhil Chawla, Mr.
Vikas Mishra, Mr. Krishn Dev Yadav, Advocates.
versus UNION OF INDIA .....Respondent Through:
Mr. Vijay Joshi, SPC alongwith Mr.
Kamaldeep, GP for UOI.
CORAM:
HON'BLE MR. JUSTICE SACHIN DATTA % 26.09.2024
O R D E R
1.
The present petition under Section 29A(5) read with Section 29A(4) of the Arbitration and Conciliation Act, 1996 (hereinafter referred to as the A&C Act) has been filed by the petitioner seeking extension of time for completion of ongoing arbitral proceedings between the petitioner and the respondent.
2.
The learned Sole Arbitrator was appointed by this Court vide order dated 07.02.2022 passed in ARB.P. No. 54/2022. 3.
Respective counsel for the parties jointly submit that the Arbitrator has been proceeding with the matter with expedition and dispatch, however, due to voluminous nature of the matter, further time is required to complete the arbitral proceedings and to make the arbitral award. 4.
Considering the averments made in the application and the submissions of respective counsel for the parties, the time period for completing the arbitral proceedings and to make the arbitral award is The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above. The Order is downloaded from the DHC Server on 03/10/2024 at 12:10:58
extended till 30.09.2025.
5.
The present petition is disposed of in the above terms. Pending application also stands disposed of.
SACHIN DATTA, J SEPTEMBER 26, 2024/at The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above. The Order is downloaded from the DHC Server on 03/10/2024 at 12:10:58