M/S Svarrnim Infrastructures Pvt. Ltd. v. M/S Wapcos Ltd.
$~58 * IN THE HIGH COURT OF DELHI AT NEW DELHI + O.M.P.(MISC.)(COMM.) 944/2025 M/S SVARRNIM INFRASTRUCTURES PVT. LTD......Petitioner Through:
Mr. H. S. Kohli and Mr. Raghav Kaushik and Mr. Mannat Kohli, Advocates versus M/S WAPCOS LTD.
.....Respondent Through:
Mr. Anmol Wadhwa, Advocate
CORAM:
HON'BLE MR. JUSTICE SUBRAMONIUM PRASAD
O R D E R
% 18.11.2025 1.
The present petition under Section 29A(5) & (5) of the Arbitration and Conciliation Act, 1996 has been filed by the Petitioner for extending the mandate of the Arbitral Tribunal.
2.
Material on record indicates that on 12.08.2023 Mr. V. K. Maheshwari, Retd. Pricipal Judge, Family Court, Rohini, Delhi, was appointed as the Sole Arbitrator by the parties to adjudicate on the disputes between the parties. The mandate of the Arbitral Tribunal has expired on 09.09.2025, and therefore, the present petition has been filed for extending the mandate of the Arbitral Tribunal.
3.
It is stated that cross-examination of Respondent is going on before the Arbitrator and, therefore, the mandate of the Arbitrator be extended for a period of 11 months.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above. The Order is downloaded from the DHC Server on 21/11/2025 at 12:33:15
4.
The Apex Court in Rohan Builders (India) Private Limited v. Berger Paints India Limited, 2024 SCC OnLine SC 2494, has held that an application for extension of the time period for passing an arbitral award under Section 29A(4) read with Section 29A(5) is maintainable even after the expiry of the twelve-month or the extended six-month period, as the case may be.
5.
In view of the facts of the present case, this Court is inclined to regularize the period from 09.09.2025 till today and extend the mandate of the Arbitral Tribunal till 30.09.2026, so that the award can be pronounced. 6.
The petition is disposed of, along with the pending applications, if any.
SUBRAMONIUM PRASAD, J NOVEMBER 18, 2025 Rahul The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above. The Order is downloaded from the DHC Server on 21/11/2025 at 12:33:15