Balu Sadhu Giri v. The Ex. Engineer, Minor Irrigation Division, Osmanabad And ORS
1004-ca-8828-19 group (withdrawal).doc
IN THE HIGH COURT OF JUDICATURE AT BOMBAY
BENCH AT AURANGABAD 1004 CIVIL APPLICATION NO.8828 OF 2019 IN FA/3563/2018 WITH CA/8829/2019 IN FA/3560/2018 WITH CA/8830/2019 IN FA/3555/2018 WITH CA/8831/2019 IN FA/3561/2018 WITH CA/8832/2019 IN FA/3558/2018 WITH CA/8833/2019 IN FA/3559/2018 GULAB SADHU GIRI
VERSUS
THE EX. ENGINEER, MINOR IRIGATION DIVISION, OSMANABAD AND ORS ...
Advocate for Applicant : Mr. Patil Laxmikant C. AGP for Respondents/State : Mr. R.B. Bagul Advocate for Respondent No.1 : Mr. P.R. Tandale ...
CORAM : SMT. VIBHA KANKANWADI, J.
DATE : 06th SEPTEMBER, 2019.
ORDER :
.
Heard both sides.
2.
Taking into consideration the fact that the acquiring body has challenged the quantum of the compensation awarded by the learned reference Court, the applicants are allowed to withdraw 50% of the amount deposited in each of the matter subject to filing an undertaking within a period of eight weeks that they would make the said amount good, if
1004-ca-8828-19 group (withdrawal).doc directed at the time of final disposal of the appeals. 3.
Civil Applications stand disposed of accordingly. (SMT. VIBHA KANKANWADI, J.) SCM