Madras High CourtWP/502/2018disposed of

V.Loganathan, v. The Chairman,

2018-03-01Honourable Mr Justice K. Ravichandrabaabu3 pages

IN THE HIGH COURT OF JUDICATURE AT MADRAS

DATED:01.03.2018 C O R A M THE HON'BLE Mr.JUSTICE K. RAVICHANDRABAABU W.P.No.502 of 2018 V.Logananthan

...Petitioner

vs 1.The Chairman, Tamilnadu Electricity Board, Anna Salai, Chennai 600 002.

2.The Tahsildar, Velachery Taluk, Tharamani, Chennai 600 113.

3.The Assistant Electrical Engineer, (Operating Maintenance) Velachery (East) Division, Chennai Electrical Distributional Circle (South-II), Chennai-42.

4.The Assistant Executive Engineer, (Operating Maintenance), Velachery, Adyar Division.

5.Sasikala

...Respondents

Prayer:Writ petition filed under Article 226 of the Constitution of India for issuance of a writ of mandamus to direct the second respondent to submit his inspection report to the third respondent as per requesting letter dated 03.10.2017 in f/vz;/c/kp/bgh/,g/nt(fpHf;F)/nfh/fl;L/m/vz; 214 for the purpose of providing electricity connection and fix the stipulated time to the second respondent.

For petitioner : Mr.G.Pavendhan For Respondents: Mr.S.K.Rameshwar for R1, 3 & 4 Standing Counsel Mr.R.Govindasamy for R2 Special Government Pleader

O R D E R

Though notice was served on the fifth respondent, she has not chosen to appear. Her name is printed in the causelist. 2.The petitioner seeks for a mandamus direct the second respondent to submit his inspection report to the third respondent as requested in letter dated 03.10.2017 for the purpose of providing electricity connection.

3.It is represented by the learned counsel for the Electricity Board that a report from the Tahsildar is awaited to get clarification with regard to the survey number of the land, for which the petitioner seeks for service connection. Therefore, he submitted that once the report is received, the request of the petitioner will be considered. 4.Learned Special Government Pleader appearing for the second respondent submits that the report will be sent to the Electricity Department within a period of four weeks. 5.Considering the above stated facts and circumstances, this writ petition is disposed of as follows: a)The second respondent shall send a report to the third respondent with regard to the clarification sought for in respect of the survey number of the land within a period of four weeks from the date of receipt of a copy of this order; b) On receipt of such report, the respondents 3 and 4 shall consider the request of the petitioner for providing electricity connection and pass orders on merits and in accordance with law within a period of four weeks thereafter. No costs.

Sd/- Assistant Registrar(CS VIII) //True copy// Sub Assistant Registrar vri To 1.The Chairman, Tamilnadu Electricity Board, Anna Salai, Chennai 600 002.

2.The Tahsildar, Velachery Taluk, Tharamani, Chennai 600 113.

3.The Assistant Electrical Engineer, (Operating Maintenance) Velachery (East) Division, Chennai Electrical Distributional Circle (South-II), Chennai-42.

4.The Assistant Executive Engineer, (Operating Maintenance), Velachery, Adyar Division.

+1cc to Mr.G.Pavendran, Advocate SR.No.15967 +1cc to Mr.S.K.Ramesh Kumar, Advocate SR.No.16149 +1cc to Government Pleader SR.No.15967 W.P.No.502 of 2018 GN(09/03/2018)