Madras High CourtWP/4941/2026dismissed

M/S.Tamil Nadu Lorry Owners Federation v. The Chairman Cum Managing Director

2026-02-16Honourable Ms. Justice P.T. Asha4 pages

IN THE HIGH COURT OF JUDICATURE AT MADRAS

DATED: 16-02-2026

CORAM

THE HON'BLE MS. JUSTICE P.T. ASHA M/s.Tamil Nadu Lorry Owners Federation (Affiliated to the All India Motor Transport Congress -AIMTC / Regd. No.1/14) Rep. by its President, Murugan Venkatachalam, Admin. Office Address 19-A, Thookanampatti, Mettur Dam, Salem District, Tamil nadu-636 401 ..Petitioner(s) Vs

1. The Chairman cum Managing Director Tamil Nadu Power Generation and Distribution Corporation Limited, (TANGEDCO) 10th Floor Eastern Wing, NPKRR Maaligai, 144, Anna Salai, Chennai-600 002.

2. The Director of Generation Tamil Nadu Power Generation and Distribution Corporation Limited, (TANGEDCO) 10th Floor Eastern Wing, NPKRR Maaligai, 144, Anna Salai, Chennai-600 002.

3. The Chief Engineer Mettur Thermal Power Station-II, Tamil Nadu Power Generation Corporation Limited (TNPGCL) Mettur, Tamil Nadu-636 406

4. The Tender committee Authorities MTPS-II, Mettur-636 406 and Tamil Nadu Power General Corporation

Limited, Chennai-600 002

5. The Superintending Engineer Mechanical-I, Mettur Thermal Power Station-II, Tamil Nadu Power Generation Corporation Limited, Mettur-636 406

6. The Prabha Engineering, No.151/a1, Periyar Street, KPN Nagar, Mettur Dam-636 406.

..Respondent(s) PRAYER: Writ Petition filed under Article 226 of the Constitution of India praying to issue a Writ of Certiorarified Mandamus calling for the records relating to the impugned one year tender proceedings in REF. CEE/MTPS-II/ SE/ M-I/ O and AHS/ O.T. No. 21/ 25-26 dated 04.07.2025 issued by the 1st respondent and quash the same and consequently direct the 3rd respondent to float a fresh, transparent tender strictly in accordance with standard BQR norms, ensuring the participation of capable and experienced local contractors For Petitioner(s):

M/s.N.Krishna Moorthy For Respondent(s):

M/s. K.Arun Prasad, Standing Counsel for R1-5

ORDER

It is now informed by the learned Standing Counsel appearing for the respondents that the tender was already allotted to the 6th respondent who had completed more than 80% of the work and only three

months remains to complete the entire work. Therefore, he would submit that nothing survives for consideration of this Court and the matter has become infructuous.

3.

In view of the submission made by the learned Standing Counsel, this Writ petition is dismissed as infructuous. No costs. 16-02-2026 Index: Yes/No Speaking/Non-speaking order ssa

P.T.ASHA, J.

ssa To 1.The Chairman cum Managing Director Tamil Nadu Power Generation and Distribution Corporation Limited, (TANGEDCO) 10th Floor Eastern Wing, NPKRR Maaligai, 144, Anna Salai, Chennai-600 002.

2.The Director of Generation Tamil Nadu Power Generation and Distribution Corporation Limited, (TANGEDCO) 10th Floor Eastern Wing, NPKRR Maaligai, 144, Anna Salai, Chennai-600 002.

3.The Chief Engineer Mettur Thermal Power Station-II, Tamil Nadu Power Generation Corporation Limited (TNPGCL) Mettur, Tamil Nadu-636 406 4.The Tender Committee Authorities MTPS-II, Mettur-636 406 and Tamil Nadu Power General Corporation Limited, Chennai-600 002 5.The Superintending Engineer Mechanical-I, Mettur Thermal Power Station-II, Tamil Nadu Power Generation Corporation Limited, Mettur-636 406.

16-02-2026