Subaya Constructions Company Limited v. Chennai Metropolitan Water Supply And Sewerage Board
A NO. 260 of 2025
IN THE HIGH COURT OF JUDICATURE AT MADRAS
DATED: 23-01-2025
CORAM
THE HONOURABLE MR JUSTICE P.B. BALAJI A NO. 260 of 2025 Subaya Constructions Company Limited Represented by its Director New No.21, Old No.26, Soundarapandian Street, Ashok Nagar, Chennai 600 083Ashok Nagar Chennai Applicant(s) Vs Chennai Metropolitan Water Supply and Sewerage Board Ashok Nagar ChennaiRepresented by the Chief Engineer (C)II, CMA Building, 4th Floor, MRC Nagar, Raja Annamalaipuram, Chennai 600 028 Respondent(s) For Applicant(s):
M/s. P.ELAKKIYA (MS.2275/2020) pavithra M, (ms.7410/22) 9790921866 For Respondent(s):
ORDER
An application has been filed under Section 29(A) of the Arbitration and Conciliation Act, 2015 to extend the mandate of the Arbiral Tribunal for a period of six months from 07.02.2025.
2. Learned counsel on both sides submit that arguments have been concluded and what remains is only in publishing the Award. https://www.mhc.tn.gov.in/judis P.B.BALAJI,J.,
sr
3. Learned counsel for the respondent submits that he has no objection for the application being allowed.
4. Considering the fact and circumstances of the case set out in the affidavit filed in support of the application, I am inclined to extend the mandate of the Arbiral Tribunal for a period of six months from 07.02.2025. 5.The application is allowed accordingly.
23-01-2025 To
1. Chennai Metropolitan Water Supply and Sewerage Board Ashok Nagar ChennaiRepresented by the Chief Engineer (C)II, CMA Building, 4th Floor, MRC Nagar, Raja Annamalaipuram, Chennai 600 028 A NO. 260 of 2025 https://www.mhc.tn.gov.in/judis