C.Sengottaiyan v. The Chairman
IN THE HIGH COURT OF JUDICATURE AT MADRAS
DATE: 24.4.2015.
CORAM
THE HON'BLE MR.JUSTICE T.RAJA W.P.No.11460 of 2015 C.Sengottaiyan
...Petitioner
vs.
1 The Chairman Tamil Nadu Electricity Generation and Distribution Corporation (TANGEDCO) Anna Salai Chennai-2 2 The Executive Engineer/O & M Tamil Nadu Electricity Generation and Distribution Corporation (TANGEDCO) Distribution Circle Mettur Dam 636 401 3 The Assistant Executive Engineer/ Distribution Tamil Nadu Electricity Generation and Distribution Corporation (TANGEDCO) Distribution Circle Mettur Dam 636 401 4 The Assistant Engineer/Distribution Tamil Nadu Electricity Generation and Distribution Corporation (TANGEDCO) Distribution Circle Mettur Dam 636 401
...Respondents
Writ Petition filed under Article 226 of the Constitution of India seeking issuance of a writ of mandamus directing the 1st respondent herein to dispose of the petitioner's revision petition dated 6.3.2003 within a time frame fixed by this court.
For Petitioner : Mr.K.Sasindran For Respondents : Mr.P.R.Dhilipkumar for TNEB
ORDER
*"This writ petition has been filed by Mr.C.Sengottaiyan, who was imposed with the punishment of stoppage of increment for two years with cumulative effect, after holding enquiry preceded by charge memo dated 3.1.2002, by way of punishment in a departmental proceedings".
2. Seeking a limited prayer of a direction to the first respondent to consider and dispose of the pending revision dated 6.3.2003 on merits and in accordance with law, as the appeal was also dismissed by the second respondent on 27.1.2003.
3. Mr.P.R.Dhgilipkumar, learned counsel takes notice for the respondents.
4. As the revision petition has been pending for quite a long time and it is not known as to why the first respondent has not come forward to dispose of the same, the first respondent is hereby directed to dispose of the pending revision petition filed by the petitioner on merits and in accordance with law within a period of five weeks from the date of receipt of copy of this order without any further delay.
5. The writ petition is disposed of accordingly. No costs. Sd/- Assistant Registrar(CS-V) Dated: 15.5.2015 *Corrected as per order of this court dated 15.6.2015 in W.P.No.11460 of 2015 Sd/ Assistant Registrar Dated: 26.6.2015 //True Copy// Sub Assistant Registrar ssk.
To 1 The Chairman Tamil Nadu Electricity Generation and Distribution Corporation (TANGEDCO) Anna Salai Chennai-2 2 The Executive Engineer/O & M To be substituted Tamil Nadu Electricity Generation and to the order Distribution Corporation (TANGEDCO) alrady despatched Distribution Circle Mettur Dam 636 401 on 4.6.2015 3 The Assistant Executive Engineer/ Distribution Tamil Nadu Electricity Generation and Distribution Corporation (TANGEDCO) Distribution Circle Mettur Dam 636 401 4 The Assistant Engineer/Distribution Tamil Nadu Electricity Generation and Distribution Corporation (TANGEDCO) Distribution Circle Mettur Dam 636 401 1 CC to Mr.K.Sasindran, Advocate SR.No. 23445 W.P.No.11460 of 2015 KU (CO) PSI (19.05.2015) kk 26/6