M.Chakravarthi (Deceased) v. The Assistant Commissioner,

2024-10-15Honourable Mr Justice G.K. Ilanthiraiyan5 pages

IN THE HIGH COURT OF JUDICATURE AT MADRAS

DATED: 15.10.2024

CORAM:

THE HONOURABLE MR. JUSTICE G.K.ILANTHIRAIYAN W.P.No.29641 of 2015 and MP.No.1 of 2015 1.M.Chakaravarthi(died) 2.C.Jayagoapal (second petitioner impleaded as per order dated 15.10.2024 made in WMP.No.32063 of 2024 in WP.No.29641 of 2015) ... Petitioner Vs.

1.The Assistant Commissioner, Zone-14, Corporation of Chennai, Puzhudhiuvakkam, Chennai 2.The Assistant Executive Engineer, Corporation of Chennai, Division No.190, Pallikaranai, Chennai 600 100 3.The Superintending Engineer, Construction-II, Chennai Metro Water and Sewerage Board, Chindadripet, Chennai 600 002 4.D.Purushothaman 5.D.Nagappan 6.D.Murugan 7.D.Ganesh 8.H.Bushanam ... Respondents 1/5

PRAYER: Writ Petition is filed under Article 226 of Constitution of India praying to issue a writ of mandamus forbearing the respondents 1 to 3 and their subordinates or any one claiming under them from constructing drainage and laying pipeline and road in the petitioner's patta land comprised in SF.No.149/1B, measuring an extent of 0.26.0 Hectares and SF.No.149/2A, measuring an of 0.10.5 hectares, totally an extent of 0.36.50 hectares, situated at Pallikaranai Village, Sholinganallur Taluk, Kancheepuram District. For Petitioners : Mr.S.Thangavel For Respondents For R1 & 2 : Mrs.Aswini Devi, Standing Counsel For R3 : Mrs.S.Deepika, Standing Counsel For R4 to 8 : Mrs.V.Srimathi

ORDER

This writ petition has been filed for direction forbearing the respondents 1 to 3 from constructing drainage and laying pipeline and road in petitioner's patta land comprised in SF.No.149/1B, measuring an extent of 0.26.0 Hectares and SF.No.149/2A, measuring an of 0.10.5 hectares, totally an extent of 0.36.50 hectares, situated at Pallikaranai 2/5

Village, Sholinganallur Taluk, Kancheepuram District. 2.

On instruction, the learned Standing Counsel appearing for respondents 2 and 3 submitted that already in the year 2010 itself, the drainage and pipeline have been laid including road in the land comprised in survey No.149/2B. Further, no drainage or pipeline or road have been laid in the petitioner's patta land. 3.

Recording the above submission, this writ petition is closed. Consequently, connected miscellaneous petitions is closed. There shall be no order as to costs.

15.10.2024 (2/2) Index: Yes/No Speaking/Non-speaking order lok 3/5

G.K.ILANTHIRAIYAN, J.

lok To 1.The Assistant Commissioner, Zone-14, Corporation of Chennai, Puzhudhiuvakkam, Chennai 2.The Assistant Executive Engineer, Corporation of Chennai, Division No.190, Pallikaranai, Chennai 600 100 3.The Superintending Engineer, Construction-II, Chennai Metro Water and Sewerage Board, Chindadripet, Chennai 600 002 15.10.2024 4/5