← Library
Madras High CourtWP/21186/2018dismissed for nonprosecution

S.R.Ramesh, v. The Chief Engineer,

2018-10-03Honourable Dr. Justice S. Vimala2 pages

IN THE HIGH COURT OF JUDICATURE AT MADRAS

DATED : 03.10.2018

CORAM

THE HON'BLE DR.JUSTICE S.VIMALA W.P.NO.21186 of 2018 S.R.Ramesh ..Petitioner Vs.

1.The Chief Engineer Tamil Nadu Electricity Board Main Buildings (N.P.K.R.R.Maligai) 144, Anna Salai Chennai 600 002.

2. The Superintending Engineer North Chennai Thermal Power Station Athipattu, Chennai 600 120.

..Respondents Prayer : Writ Petition filed under Article 226 of the Constitution of India praying to issue a Writ of Mandamus directing the respondents 1 and 2 to consider the representation and regularize the rigger job either at the 2nd respondent NorthChennai Thermal Power Station (NCTPS) or any other units based upon petitioner's representation dated 24.01.2018. For Petitioner : No Appearance For Respondents : Mr.Harun Al-Rasheed for M/s.T.S.Gopalan & Co.,

O R D E R

There was no representation when the matter was taken up on 18.09.2018 and hence it was listed for dimissal today. Even today, there is no representation for the petitioner. M/s.T.S.Gopalan & Co., takes notice for the respondents and Mr.Harun Al-Rasheed was present on behalf of the respondents. https://hcservices.ecourts.gov.in/hcservices/

2. The writ petition is dismissed for non prosecution. No costs. Connected W.M.P. is closed.

kst Sd/- Assistant Registrar //True Copy// Sub Assistant Registrar To 1.The Chief Engineer Tamil Nadu Electricity Board Main Buildings (N.P.K.R.R.Maligai) 144, Anna Salai Chennai 600 002.

2. The Superintending Engineer North Chennai Thermal Power Station Athipattu, Chennai 600 120.

KR/17/10/18 W.P.No.21186 of 2018 https://hcservices.ecourts.gov.in/hcservices/