R.Jayakumari v. The Executive Engineer ( O And M)
IN THE HIGH COURT OF JUDICATURE AT MADRAS
DATED : 29.04.2024
CORAM
THE HONOURABLE MR. JUSTICE S.M.SUBRAMANIAM and W.M.P.N o.10571 of Tmt.R.Jayakumari ... Petitioner Vs.
1.The Executive Engineer O & M, Tamil Nadu Generation And Distribution Corporation Ltd (TANGEDCO) Ambattur 3rd Main Road, Sub Station Complex, Ambattur Estate, Chennai 600 058.
2.The Assistant Executive Engineer Tamil Nadu Generation And Distribution Corporation Limited (TANGEDCO), Kallikuppam, Ambattur, Chennai 600 053 3.The Assistant Engineer Tamil Nadu Generation And Distribution Corporation Limited (TANGEDCO), Kallikuppam, Ambattur, Chenani 600 053 4.Sundari 5.Yesunesan 1/6
6.The Commissioner, Urban Land Ceiling, Chepauk, Chennai.
7.The District Collector, Chennai District.
8.The Tahsildar, Ambattur Taluk, Chennai.600 053.
(R6 To R8 are Suo Motu impleaded as per order dated 08.04.2024 in WP.9552/2024 by SMSJ)
...Respondents
Prayer:- Writ petition filed under Article 226 of the Constitution of India praying for issuance of a writ of Certiorarified Mandamus, calling for records of the third respondent issued vide letter No.U PO / E and Para / Kallikuppam / KO. Valakku / A. En 355 dated 01.02.2024 and quash the same and direct the third respondent to restore the service connection to the petitioner's property bearing Plot No 45 Pasumpon Nagar, Murugambedu Road, Kallikkuppam, Chennai 600 053.
For Petitioner : Mr.L.Dhamodharan For Respondents : Mr.L.Jaivenkatesh, SC for TANGEDCO [for.R.1 to R.3] : Mr.U.Baranidharan,AGP [for R.6 to R.8] 2/6
O R D E R
This writ petition has been filed challenging the letter issued by the third respondent vide letter No.U PO / E and Para / Kallikuppam / KO. Valakku / A. En 355 dated 01.02.2024, and quash the same and direct the third respondent to restore the service connection to the petitioner's property bearing Plot No. 45 Pasumpon Nagar, Murugambedu Road, Kallikkuppam, Chennai 600 053.
2. Pursuant to the interim order passed by this Court on 08.04.2024, the Revenue Tahsildar conducted an enquiry and found that the subject property is a patta land and to that effect, a report has been filed.
3. The Assistant Engineer, Tamil Nadu Electricity Board, gave instructions stating that the Revenue Tahsildar conducted a field inspection and found that the petitioner is in possession of patta land. Thus, there is no impediment for restoring electricity service connection to the petitioner's premises.
3/6
4. In view of the facts and circumstances, the respondents are directed to restore the electricity service connection in the premises of the petitioner within a period of two days.
5. With these directions, the Writ petition stands allowed. No costs. Consequently, connected miscellaneous petition is closed. (sha) 29.04.2024 Index : Yes Speaking Order 4/6
To 1.The Executive Engineer O & M, Tamil Nadu Generation And Distribution Corporation Ltd (TANGEDCO) Ambattur 3rd Main Road, Sub Station Complex, Ambattur Estate, Chennai 600 058.
2.The Assistant Executive Engineer Tamil Nadu Generation And Distribution Corporation Limited (TANGEDCO), Kallikuppam, Ambattur, Chennai 600 053 3.The Assistant Engineer Tamil Nadu Generation And Distribution Corporation Limited (TANGEDCO), Kallikuppam, Ambattur, Chenani 600 053 4.The Commissioner, Urban Land Ceiling, Chepauk, Chennai.
5.The District Collector, Chennai District.
6.The Tahsildar, Ambattur Taluk, Chennai.600 053.
5/6
S.M.SUBRAMANIAM . J., (sha) and W.M.P.No.10571 of 2024 29.04.2024 6/6