← Library
Madras High CourtWP/13236/2026disposed of with direction

P. Devendran v. The Executive Engineer

2026-04-09Honourable Mr Justice M.Dhandapani4 pages

IN THE HIGH COURT OF JUDICATURE AT MADRAS

DATED: 09-04-2026

CORAM

THE HON'BLE MR JUSTICE M.DHANDAPANI AND WMP NO. 14494 OF 2026

1. P. Devendran S/o.Palanisamy, No.4/79, Pothiyan Thottam, Palakarai, Perundurai Taluk, Erode District.

2. Krishnaveni W/o.Dhachinamurthi, 2/79, Koolikattuvalasu, Palakarai, Perundurai Taluk, Erode District.

..Petitioner(s) Vs

1. The Executive Engineer Water Resources Organization Department (WRO) Lower Bhavani Basin Division, Eorde-638 002

2. The Asst. Executive Engineer, Water Resources Organization Department (WRO) Lower Bhavani Basin Division, Goundpaadi, Erode-638 555 ..Respondent(s) to consider the representation dated 02.08.2024 made to 1st and 2nd respondents to permit the petitioner herein to transit irrigation pipe of 4 inch diameter from S.No.48/3 and 197/3B agricultural cultivation well to another side of cultivation lands in S.No.41/11, across the LBP water canal under situated in S.No.45/4 at Palakarai Village, Perundurai Taluk, Erode

District and pass appropriate orders within stipulated time period as may be fixed by this Honble court and pass appropriate orders within stipulated time period as may be fixed by this Honble court For Petitioner(s):

Mr.V.Janarthanan For Respondent(s):

Mr.A.Selvendran, Special Govt. Pleader Order This Writ Petition is filed for a Mandamus seeking for a direction to consider the representation dated 02.08.2024 made to the respondent 1 and 2 to permit the petitioner herein to transit irrigation pipe of 4" inch diameter from S.No.48/3 and 197/3B, agricultural cultivation well to another side of cultivation lands in S.No.41/11, across the LBP water canal under situated in S.No.45/4 at Palakarai Village, Perundurai Taluk, Erode District and pass appropriate orders within stipulated time period as may be fixed by this Court.

2. The case of the petitioner is that he is doing cultivation in the said village for two generations having water resources in one side and in another side of the cultivation land in S.No.41/11 there is no water resources. In this regard, he has submitted a representation to the respondents 1 and 2 dated 02.08.2024 for transmitting the water through SBI Water Canal. Since no action was taken on the petitioner's representation, he has come forward with the present writ petition.

3. Heard both sides and perused the materials on record.

4. Considering the limited scope of prayer, this Court, without expressing anything on merits, directs the 1st respondent to consider the petitioner's representation dated 02.08.2024 and pass orders on merits and in accordance with law, within a period of six weeks from the date of receipt of a copy of this order.

5. This Writ Petition stands disposed of with the above direction. No costs. Consequently, connected miscellaneous petition is closed. 09-04-2026 Index: Yes/No Speaking/Non-speaking order Sk To

1. The Executive Engineer Water Resources Organization Department (WRO) Lower Bhavani Basin Division, Eorde-638 002.

2. The Asst. Executive Engineer, Water Resources Organization Department (WRO) Lower Bhavani Basin Division, Goundpaadi, Erode-638 555

M.DHANDAPANI J.

Sk AND WMP NO. 14494 OF 2026 09-04-2026 3.