IN THE HIGH COURT OF JUDICATURE AT MADRAS

DATED: 03.03.2023

CORAM:

THE HONOURABLE MR.JUSTICE N.SATHISH KUMAR Zubaida Bivi ... Petitioner Vs

1. The Commissioner, Corporation of Chennai, Rippon Buildings, Chennai - 600 003.

2. The Executive Engineer, Zone V, Corporation of Chennai, 62, Chidambaram 5th Street, Basin Bridge, Chidambaram Nagar, George Town, Chennai, Tamil Nadu - 600 001.

3. The Assistant Engineer, Zone 5, Division No.61, Corporation of Chennai, No.23, Driver Street, Pudupet, Chennai - 600 002.

4. Haja Mohideen

5. Shahul Hameed

6. Bhuvneshvari ... Respondents Prayer:- Writ Petition filed under the Article 226 of Constitution of India, to issue a Writ of Mandamus to directing the respondents to consider the 1/4

petitioner's representation dated 08.09.2020 and to initiate appropriate action against the respondents 4 to 6 herein for the illegal and unauthorized erection of shop in front of the property of the petitioner. For Petitioner : Mr.A.Muthukumar For Respondents : Mr.D.B.R.Prabhu Standing Counsel for Chennai Corporation

ORDER

This Writ Petition has been filed to direct the respondents to consider the representation of the petitioner dated 08.09.2020 and to initiate appropriate action against the respondents 4 to 6 herein for the illegal and unauthorized erection of shop in front of the property of the petitioner.

2. The case of the petitioner is that the respondents 4 to 6 have erected permanent shop in front of the petitioner's house thereby affecting the flow of traffic as well as free flow of ingress and egress to her property. In this regard the petitioner has also given a representation to the respondents dated 08.09.2020. However, the same has not been considered by the respondents. Hence, the present Writ Petition has been filed for the aforesaid relief.

2/4

3. Considering the limited prayer sought in the Writ Petition, respondents are directed to consider the representation of the petitioner dated 08.09.2020 and take action as per law within a period of one month from the date of receipt of a copy of this Order.

4. With the above direction, this Writ Petition is disposed of. No costs.

03.03.2023 vrc To

1. The Commissioner, Corporation of Chennai, Rippon Buildings, Chennai - 600 003.

2. The Executive Engineer, Zone V, Corporation of Chennai, 62, Chidambaram 5th Street, Basin Bridge, Chidambaram Nagar, George Town, Chennai, Tamil Nadu - 600 001.

3. The Assistant Engineer, Zone 5, Division No.61, Corporation of Chennai, No.23, Driver Street, Pudupet, Chennai - 600 002. 3/4

N.SATHISH KUMAR, J.

vrc 03.03.2023 4/4