G.Kaliammal, v. The Chairman
IN THE HIGH COURT OF JUDICATURE AT MADRAS
DATED : 27.09.2018
CORAM
THE HONOURABLE Mr.JUSTICE V.BHARATHIDASAN W.P. 24470 of 2018 and W.M.P. 28498 of 2018 G.Kaliammal ... Petitioner Vs
1. The Chairman, Chennai Metro Water Supply and Sewerage Board, Chennai-600 002.
2. The Assistant Engineer (Registration), No.1, Pumping Station Road, Chennai Metro Water Supply and Sewerage Board, Chennai-600 002.
3. The Area Engineer-XIII, Chennai Metro Water Supply and Sewerage Board, No.42, First Main Road, Adyar, Chennai-600 020.
4. The Assistant Engineer, Chennai Metro Water Supply and Sewerage Board, Rajalakshmi Nagar, 8th Cross Street, Velacherry, Chennai-600 042.
... Respondents PRAYER : Petition filed under Article 226 of the Constitution of India, praying to issue a Writ of Mandamus, directing the respondents to consider the representation of the petitioner dated 30.07.2018 and direct the 4th respondent to grant water and sewerage connection to the petitioner.
For Petitioner : Mr.K.R.Pughazhendhi For Respondents : Mr.N.Ramesh, Standing Counsel for R1 to R4
O R D E R
This Writ Petition has been filed seeking for a direction directing the 4th respondent to give water and sewerage connection to the petitioner premises at New Door No.3, Draupathi Amman Koil 2nd Street, Velacherry, Chennai-600 042.
2. The grievance of the petitioner is that the petitioner has made application before the 4th respondent for granting water and sewerage connection and he has also paid the necessary fees for the same. Thereafter, the 4th respondent has also inspected the premises and so far, no order has been passed. Subsequently, the petitioner has made representation to the respondents on 30.07.2018, but, till date, the petitioner's application was not considered by the 4th respondent. Hence, the present Writ Petition has been filed by the petitioner.
3. I have considered the rival submissions and perused the records carefully.
4. On considering the fact that the representation of the petitioner is pending with the respondents, without going to the merits of the case, the 4th respondent is directed to consider the petitioner's application for the grant of water and sewerage connection to the petitioner premises bearing New Door No.3, Draupathi Amman Koil 2nd Street, Velacherry, Chennai-600 042 and pass suitable orders on merits and in accordance with law within a period of four weeks from the date of receipt of the copy of this order.
5. With the above direction, the Writ Petition stands disposed of.
No costs. Consequently, connected Writ Miscellaneous Petition is closed.
Sd/- Assistant Registrar(CS V) //True Copy// Sub Assistant Registrar
rpp To
1. The Chairman, Chennai Metro Water Supply and Sewerage Board, Chennai-600 002.
2. The Assistant Engineer (Registration), No.1, Pumping Station Road, Chennai Metro Water Supply and Sewerage Board, Chennai-600 002.
3. The Area Engineer-XIII, Chennai Metro Water Supply and Sewerage Board, No.42, First Main Road, Adyar, Chennai-600 020.
4. The Assistant Engineer, Chennai Metro Water Supply and Sewerage Board, Rajalakshmi Nagar, 8th Cross Street, Velacherry, Chennai-600 042.
+1cc to Mr.K.R.Pughazhendhi, Advocate Sr.67292 +1cc to Mr.N.Ramesh, Advocate Sr.67302 W.P. 24470 of 2018 and W.M.P. 28498 of 2018 sv[co] srg 26/11/2018