Madras High CourtWP/17765/2019disposed of

M/S. Annamalaiyar Power Bricks Private Limited., v. The Chief Engineer/ Civil Designs And Hydro Projects,

2019-06-24Honourable Dr Justice G. Jayachandran3 pages

IN THE HIGH COURT OF JUDICATURE AT MADRAS

DATED : 24.06.2019

CORAM

THE HONOURABLE DR.JUSTICE G.JAYACHANDRAN W.P.No.17765 of 2019 M/s.Annamalaiyar Power Bricks Private Limited, rep.by its Director Mr.S.Masilamani ... Petitioner

Versus

1.The Chief Engineer/Civil Designs & Hydro Projects, 3rd Floor, NPKRR Maligai, No.144, Anna Salai, 2.The Chief Engineer, 3.The Superintending Engineer (Mechanical), 4.The Chairman cum Managing Director, Tamil Nadu Generation and Distribution Corporation Ltd.,(TANGEDCO), 144, Anna Salai, ... Respondents PRAYER:

Writ Petition filed under Article 226 of the Constitution of India, praying for the issue of Writ of Mandamus directing the 1st respondent to consider petitioner representation dated 09.07.2018 within a time frame. For Petitioner : Mr.Saravanan.A For Respondents : Mr.S.K.Rameshwar

O R D E R

Heard the learned counsel for the petitioner and the learned standing counsel for the respondents.

2. The case of the petitioner is that the power Bricks unit run by the petitioner faced bad financial weather leading to closure in the year 2013. Later, after clearing all the dues to the bank, the petitioner sought for (*)supply of dry fly ash to the unit. His request dated 09.07.2018 made to the Chief Engineer Civil Design & Hydro Projects, Chennai is yet to be considered. So far, no order is passed on his request. He seeks mandamus to direct the first respondent to consider the petitioner's representation dated 09.07.2018 and pass appropriate orders.

3. On perusal of the documents filed by the petitioner, this Court finds that no acknowledgment of receipt of the representation dated 09.07.2018. However, the learned counsel for the petitioner submitted that the same was handed over to the first respondent in person through special messenger on 10.07.2018.

4. Be that as it may, the petitioner shall make a representation in continuation of earlier representation dated 09.07.2018 to the first respondent and on receipt of such representation, the first respondent shall consider the same in accordance with law, within a period of eight weeks from the date of receipt of copy of this order.

5.With the above directions, this writ petition is disposed of. There shall be no order as to costs. s/d- Assistant Registrar(CS VI) (11.07.2019) True Copy Sub-Assistant Registrar rpl To 1.The Chief Engineer/Civil Designs (*)To be substituted the & Hydro Projects, order copy already despatched 3rd Floor, NPKRR Maligai, on 17.07.2019 No.144, Anna Salai, 2.The Chief Engineer,

3.The Superintending Engineer (Mechanical), 4.The Chairman cum Managing Director, Tamil Nadu Generation and Distribution Corporation Ltd.,(TANGEDCO), 144, Anna Salai, +1 CC to Mr.A.Saravanan, Advocate sr 64437 +1 CC to Mr.S.K.Rameshwar, Advocate sr 52786. W.P.No.17765 of 2019 SP(04/07/2019) CSL/01.08.2019