← Library
Madras High CourtWP/16591/2010disposed of

P.Anandan v. The Superintending Engineer

2018-04-24Honourable Mr Justice S.M. Subramaniam25 pages

IN THE HIGH COURT OF JUDICATURE AT MADRAS

DATED :24.04.2018

CORAM

THE HON'BLE MR.JUSTICE S.M.SUBRAMANIAM W.P.No.16591 of 2010 W.P.No.21020 of 2012 W.P.No. 23814 of 2013 W.P.No.23207 of 2015 W.P.Nos.25656 to 25659 of 2016 W.P.Nos.29968 to 29970 of 2016 W.P.Nos.30060, 30422 & 30532 of 2016 and W.M.P.Nos.25930 to 25932, 26371 of 2016 W.M.P.No.26468 of 2016 1.P.Anandan 2.R.Karunanidhi 3.K.Murthy 4.S.Saravanan 5.B.Kadar Sheriff 6.A.Ramesh 7.S.Prabhukumar 8.S.Chandran 9.K.Marudhacahalam 10.M.Sivakumar 11.S.Senthil Kumar

...Petitioners in W.P.No.16591 of 2010

1 K.PALANISAMY ... PETITIONERS in WP No.21020 of 2012 2 V.K.PALANISAMY 3 V.SIVAKUMAR 4 M.GOTHANDARAMAN 5 C.ARUCHAMY 6 M.VENKATACHALAM 7 S.SUDHAKAR 8 R.SURESH

9 M.GANESAN 10 G.SUNDARA KUMAR 11 V.SAKTHIVEL 12 M.SURESH 13 M.KUMARESAN 14 P.RAGHUPATHY 15 K.SUBRAMANIAM 16 P.THANGARAJ 17 P.SURESH 18 K.SHANMUGAM 19 T.RADHAKRISHNAN 20 R.RAMESH 21 K.VENKATESAN 22 M.PERIYASAMY 23 R.MURUGESAN 24 M.SIVAKUMAR 1 P.SARAVANAMOORTHY ... PETITIONERS in WP No.23814 of 2013 2 K.SARAVANAN 3 A.VINOTHKUMAR 1 S.N.DURAISAMY ... PETITIONERS in WP No.23207 of 2015 1 A.NEHRU ... PETITIONERS in WP No.25656 of 2016

1 P.MOORTHY ... PETITIONERS in WP No.25657 of 2016 1 K.MANOHARAN ... PETITIONERS in WP No.25658 of 2016 1 M.NETHAJI ... PETITIONERS in WP No.25659 of 2016 1 P.M.MUNIRAJ ... PETITIONERS in WP No.29969 of 2016 1 M.BALAKRISHNAN ... PETITIONERS in WP No.29970 of 2016 1 V.CHINNARAJ ... PETITIONERS in WP No.29968 of 2016 1 M.THANGAVELU ... PETITIONERS in WP No.30060 of 2016 2 A.SARAVANAN 3 L.MURUGESON 4 R.BALAMURUGAN 5 S.MURUGAN 6 V.ANBAZHAGAN 7 S.GANDHI 8 E.ANANDAN 9 V.PARANDHAMAN 10 M.JAYAPAL 11 C.JEGADESAN 12 M.PRAKASH RAO 13 S.MOHAN 14 M.RAVI 15 C.MUTHU 16 B.SASIKUMAR

17 N.MUNIRATHNAM 18 A.AMULRAJ 19 T.S.THIRUMAL 20 R.THAMIZSELVAN 21 V.MUNUSAMY 22 C.DEVAN 23 M.GNANASEKAR 24 D.KUMARAVEL 25 T.RAGU 26 P.KUMAR 27 S.KUMAR 28 L.GOPIKRISHNAN 29 K.VIJAYAKUMAR 30 B.BASKAR 31 P.JABARAJ 32 K.BALASUBRAMANI 33 J.HARIRAMAN 34 S.RAVICHANDRAN 35 K.BALAJI 36 S.RAJESH 37 A.RAJI 38 P.SUDHAKAR 39 V.RAJINI

40 E.RAMAMOORTHY 41 M.KARTHIK 42 K.ILAYARAJA 43 M.BABU 44 L.GOPINATH 45 D.PARTHASARATHI 46 J.SELVAM 47 V.THULUKKANAM 48 S.BOOBALAN 49 M.VENKATESAN 50 J.BHUVANESHWARAN 51 D.SAMPATH 52 G.RAMU 53 C.MURALI 54 R.MANOHARAN 55 V. MUNUSAMY 56 V.BATHMANAPAN 57 M.THIYAGU 58 C.KUMAR 59 M.MUNUSAMY 60 K.BABU 61 S.BABU

62 D.KANDASAMY 63 C.SURESH 64 K.GAJENDRAN 65 R.BALU 66 D.SRINIVASAN 67 S.DEVANTHIRAN 68 K.VELU 69 A.SIVA 70 S.DHAMODHARAN 71 C.GOPAL 72 S.YAGAPPAN 73 E.THIRUMALAI 74 K.RAGU 75 V.NARASIMMAN 76 R.KATHIRESAN 77 V.P.JOLLY 78 N.GOVINDARAJ 79 E.SARANGAN 80 S.PARTHIBAN 81 M.MURUGANANDHAM 82 S.NATARAJAN 83 S.DEIVANAYAGAM 84 M.PARASURAMAN

85 M.MAGALINGAM 86 T.ROSE 87 M.SAMBASIVAN 88 G.KARUNAGARAN 89 K.MUNIKRISHNAN 90 K.BALAN 91 N.JAYSHANKAR 92 E.THIRUPATHI 93 T.PANDIYARASU 94 I.MUHAMMED ILIYAS 95 K.SEKAR 96 C.SRINIVASAN 97 N.SABHASTIN 98 S.PANDIAN 99 N.ELUMALAI 100 G.ELUMALAI 101 P.VINOTH 102 K.P.RAJ 103 R.S.DILLI BABU 104 M.RAVI 105 M.RAJINI 106 D.SUGU

107 T.A.ARUL 108 M.SARAVANAN 109 V.S.RAJENDRAN 110 B.BHARATHI 111 M.RAVI 112 N.SHANKAR 113 S.ANANDHAN 114 J.SEKAR 115 S.RAMESH 116 E.CHANDRASEKAR 117 S.RAMACHANDRAN 118 G.DEVARAJ 119 R.SARAVANAN 120 V.JAYASEELAN 121 E.KUMAR 122 E.RAVI 123 C.MUNUSAMY 124 V.NILAVAZHAGAN 125 B.MANIKANDAN 126 S.BALAJI 127 L.SEERALAN 128 M.THIRUMALAI 129 M.LAKSHMANAN

130 V.BOOPATHI 131 R.CHELLAPPAN 132 G.MUNIVEL 133 P.BABU 134 M.MUNUSAMY 135 K.MARIMUTHU 136 E.SAMBATH 137 D.VANJI 138 M.MANI 139 G.DELLI BABU 140 V.RAMAMURTHY 141 S.RAJAMANIKKAM 142 S.THIYAGARAJAN 143 S.SIVAJI 144 T.GOVINDARAJ 145 R.SURESH 146 R.SENDHIL 147 N.MOORTHI 148 A.LAKSHMANAN 149 M.VINAYAGAM 150 A.MATHEW 151 G.SUNDARAM

152 G.RAMESH 153 V.MANI 154 E.GANAPATHI 155 M.DHARANI 156 D.ALLIMUTHU 157 A.AMBETHKAR 158 K.BALAKRISHNAN 159 A.VIGIRAN 160 R.MANI 161 S.MARI 162 H.L.SATHIYANATHAN 163 C.RAVI 164 E.THIRUPATHI 165 C.RAVI 166 P.KUMAR 167 V.SIVAKUMAR 168 C.GOPI 169 M.MADURAI MANNAN 170 K.MURUGESAN 171 D.YOBU RAJAN 172 D.MURUGESAN 173 J.VISHVANADHAN 174 A.MURALI MOHAN

175 M.RAJKUMAR 176 M.VENUGOPAL 177 G.BAKIARAJ S/O.GOVINDAN 178 G.BALAKRISHNAN 179 D.RAJENDRAN S/O.DHAYALAN 180 A.MURALI S/O.ATHIMOOLAM 181 S.MOHAN S/O.SAMI 182 E.KOTHANDAN S/O.ELUMALAI 183 K.SHANMUGASUNDARAM 184 T.MURUGESAN 185 C.VEERABHADRAM 186 C.MOORTHY S/O.CHINNAPAYAN 187 M.ELUMALAI S/O.MUNUSAMI 188 P.RAJAGOPAL 189 K.MOHAN 190 S.DHAYALAN 191 K.PAZHANISAMY 192 P.SHANMUGAM S/O.PALANI 193 R.VALMURTHY 194 S.ARUL S/O.SIVAN 195 G.VINOTH KANNA 196 R.RAJI S/O.S.RAMACHANDRAN

197 A.PRABHU S/O.M.ARUMUGAM 198 P.SIMSON S/O.PONNAN 199 M.DEVARAJI 200 V.DEEVAKUMAR 201 G.CHANDRA BABU 202 L.DEVAKUMAR 203 E.MURUGAN 204 H.NITHIYANANDHAM 205 G.BABU 206 D.KUMAR 207 R.SARAVANAN S/O.RATHINAM 208 B.KUMARESAN 209 B.BABU S/O.M.BALARAMAN 210 K.ANNAMALAI 211 K.RAVI S/O.KANNAIYAN 212 G.SELVAM 213 D.RAVI SANKAR 214 S.GOPI S/O.SAGADEVAN 215 S.SEKAR S/O.D.SIVALINGAM 216 E.MURALI S/O.M.R.ELUMALAI 217 T.SANKAR S/O.E.THIRUVENGADAM 218 L.BALAJI 219 D.ARULMANI S/O.DURAI

220 K.VELU S/O.KATHIRVEL 221 K.SREEDHARAN 222 A.BABU S/O.M.ARUMUGAM 223 R.YUVARAJ S/O.K.RUDHURAKOTTI 224 S.KANNAN S/O.SUBRAMANI 225 K.KARUPPAIYA 226 D.CHANDRASEKAR 227 G.ELANGO S/O.GAUGADURI 228 P.GAJENDRAN 229 N.VELAYUTHAM 230 M.DEVENDRAN 231 R.MURUGAN 232 M.ANANDHAN 233 V.DEVARAJ 234 N.MATHI 235 A.RAVI 236 G.VELU 237 M.KUMARAVEL 238 E.ARUL 239 V.RAVI 240 E.KUPPAN 241 S.SEKAR

242 M.RAJENDRAN 243 M.PANCHACHERAM 244 G.RAVIKUMAR 245 S.MANIGANDAN 246 S.SINGARAJAN 247 S.BAKTAVACHALAM 248 M.RAJI 249 S.FELIX 250 E.PRABHU 251 D.EESAN 252 E.GOPI 253 M.SEKAR 254 M.GOPI 255 M.VASANTHA KUMAR 256 M.SENTHIL KUMAR 257 A.NATARAJAN 258 E.RAGUPATHI 259 K.ALEXPANDIAN 260 G.PANDIAN 261 M.MUGUNDHAN 262 R.JAIGANESH 263 R.DILLIBABU 264 A.SIVAKUMAR

265 A.DHAYALAN 266 P.MOHAN 267 D.MUTHUKUMAR 268 T.SHANMUGAM 269 K.KAJA 270 T.UMAPATHY 271 M.SELVANATHAN 272 V.NIRMAL KUMAR 273 S.SARAVANAN 274 D.THANGARAJ 275 A.SHANKAR 276 T.NAGARAJ 277 J.SEEMAN 278 C.MOHAMED THESTHAKIR 279 R.JOTHI 280 G.DHEENADAYALAN 281 M.RAMESH 282 B.JAYA PRAKASH 283 D.KUMARESAN 284 C.RAMAMURTHY 285 M.RAMADASAN 286 R.M.SUNDARAM

287 E.SELVARAJ 288 M.SATHISH 289 P.T.RAMURTHY 290 D.SURESH 291 P.SIVANATHAN 292 P.BALAMUTHU 293 R.SURESH 294 A.RAMESH 1 A.JAGDEESAN ... PETITIONERS in WP No.30422 of 2016 2 M.RAHIM 3 S.MEGAN 4 A.PERUMAL 5 K.THIRUMALAI 1 MADHULINGAM ... PETITIONERS in WP No.30532 of 2016 2 C.CHINNATHAMBI 3 G.SHANMUGAM 4 N.G.DHURVASAN 5 D.SELVAM 6 B.SIVARAJ 7 M.CHINNASAMY 8 J.THOTTAIYAN 9 G.MALLIKARJUNAN

10 M.PERUMAL 11 P.V.DAYESWARAN 12 E.ARIVALAGAN 13 K.PALANI 14 E.BALAMURUGAN 15 JEGADEESAN Vs 1.The Superintending Engineer Gobi Electricity Distribution Circle, TamilNadu Electricity Board Non TN Generation & Distribution Corporation Ltd., Gobichettipalayam 638 454.

2.The Inspector of Labour Erode - 9.

... Respondents in WP.16591 OF 2010 1 THE SUPERINTENDING ENGINEER GOBI ELECTRICITY DISTRIBUTION CIRCLE TAMILNADU ELECTRICITY BOARD GOBICHETTIPALAYAM 638 454 2 THE INSPECTOR OF LABOUR ERODE-9 ... RESPONDENTS in WP No.21020 of 2012 1 THE CHAIRMAN TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION (TANGEDCO) NO.144 ANNA SALAI CHENNAI-2.

2 THE CHIEF ENGINEER (PERSONNEL) TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION NO.144 ANNA SALAI CHENNAI-2.

3 THE SUPERINTENDING ENGINEER GOBI ELECTRICITY DISTRIBUTION CIRCLE TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION GOBICHETTIPALAYAM.

... RESPONDENTS in WP No.23814 of 2013 1 THE TAMIL NADU GENERATION AND .

DISTRIBUTION CORPORATION LTD (TANGEDCO) REP. BY ITS CHAIRMAN NO.144 ANNA SALAI CHENNAI-2 2 THE EXECUTIVE ENGINEER TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LTD SATHYAMANGALAM DIVISION ERODE DISTRICT.

3 THE SUPERINTENDENT ENGINEER OPERATION AND MAINTENANCE (O&M) TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LTD GOBICHETTIPALAYAM CIRCLE ERODE DISTRICT .. RESPONDENTS in WP No.23207 of 2015 1 THE TAMILNADU ELECTRICITY GENERATION & DISTRIBUTION CORPORATION LTD.

REP. BY THE CHAIRMAN NO.144 ANNASALAI CHENNAI-2.

2 THE CHIEF ENGINEER (PERSONNEL) TAMILNADU ELECTRICITY GENERATION & DISTRIBUTION CORPORATION LTD. NO.144 ANNASALAI CHENNAI-2.

3 THE SUPERINTENDING ENGINEER TAMILNADU ELECTRICITY GENERATION & DISTRIBUTION CORPORATION LTD.

TIRUVANNAMALAI.

4 THE INSPECTOR OF LABOUR TIRUVANNAMALAI.

... RESPONDENTS in WP No.25656 to 25659 of 2016

1 THE TAMIL NADU ELECTRICITY MAINTENANCE AND DISTRIBUTION TANGEDCO REP BY MANAGING DIRECTOR MOUNT ROAD ANNA SALAI CHENNAI-600 002 2 THE SUPERINTENDING ENGINEER THIRUVANNAMALAI ELECTRICITY DISTRIBUTION CIRCLE TNEB THIRUVANNAMALAI ... RESPONDENTS in WP No.29968 to 29970,30422, 30532 of 2016 1 THE PRINCIPAL SECRETARY TO GOVERNMENT ENERGY DEPARTMENT GOVT. OF TAMILNADU SECRETARIAT CHENNAI-9 2 THE CHAIRMAN & MANAGING DIRECTOR TAMILNADU GENERATION AND DISTRIBUTION CORPORATION LTD. (TANGEDCO) 10TH FLOOR N.P.K.R.R. MALIGAI 144 ANNA SALAI CHENNAI-2 3 THE CHIEF ENGINEER (PERSONNEL) TAMILNADU GENERATION AND DISTRIBUTION CORPORATION LTD. (TANGEDCO) 8TH FLOOR EASTERN WING N.P.K.R.R.

MALIGAI 144 ANNA SALAI CHENNAI-2 4 THE CHIEF ENGINEER/ETPS ENNORE THERMAL POWER STATION KATHIVAKKAM HIGH ROAD ENNORE CHENNAI-57 5 THE HINDUSTAN SECURITY & DETECTIVE SERVICES 727 AMBAL BUILDING ANNA SALAI CHENNAI-6 6 THE SOUTHERN SECURITY SERVICE 50 9TH STREET SOURASHTRA NAGAR CHOOLAIMEDU HIGH ROAD CHENNAI-94 7 THE GUARDIAN SECURITY BUREAU LTD. 33 NAKKER NEW STREET MADURAI 625 001 8 THE SECURITY & DETECTIVE BUREAU LTD.

CHENNAI-34 ... RESPONDENTS in WP No.30060 of 2016 PRAYER :

WP.16591 OF 2010:

Petition filed Under Article 226 of the Constitution of India to issue of Writ of Mandamus, directing the 1st respondent to implement the order dated 7.12.2009 in Na.Ka.No.B/1742/2009 of the 2nd respondent conferring permanency from the date of completion of 480 days with time scale of pay, arrears towards difference in salary and all other attendant benefits, award costs.

WP No.21020 of 2012 Writ of Mandamus, directing the 1st respondent to implement the order dated 30.6.2010 in Na.Ka.No. B / 1741 /2008 issued by the 2nd respondent inspector of Labour, Erode authority under the Tamilnadu Industrial Establishments (Conferment of Permanent Status to workmen) Act, 1981 by conferring permanency from the date of completion of 480 days with time scale of pay, arrears towards difference in salary and all other attendant benefits, award costs WP No.23814 of 2013 Writ of Mandamus, Directing the respondents 1 and 2 to consider and pass orders on the representation of the petitioners dated 29.04.2013 and regularize the service of the petitioners as per the list submitted by the 3rd respondent to the 2nd respondent in pursuant to the Memo No.128688/G.58/ G.582/2009-1 dated 12.05.

2010 on the file of the 2nd respondent WP No.23207 of 2015 Writ of Certiorarified Mandamus, To call for the records relating to the impugned order passed by the 3rd respondent vide Letter No.313/ NiPi2/ E.Ni.Uoo/ Ko.Va/15 dated 24.4.2015 quash the same as illegal and consequently direct the respondent authorities to approve the petitioner appointment dated 22.3.1995 and regularize the petitioner employment as permanent status on par with similarly placed persons and grant all consequential benefits thereof WP No.25656 of 2016 Writ of Mandamus, Directing the respondents 1 to 3 to implement the order of the 4th respondent made in E/3145/08 dated 14.06.

2010 under the provisions of the Tamilnadu Industrial Establishments (Conferment of permanent status to workmen) Act 1981 and thereby direct the respondents 1 to 3 to absorb the petitioner in the 1st respondent corporation as permanent employee WP No.25657 of 2016 Writ of Mandamus, Directing the respondents 1 to 3 to implement the order of the 4th respondent made in E/3145/08 dated 14.06.

WP No.25658 of 2016 Writ of Mandamus, Directing the respondents 1 to 3 to implement the order of the 4th respondent made in E/3145/08 dated 14.06.2010 under the provisions of the Tamilnadu Industrial Establishments (Conferment of permanent status to workmen) Act 1981 and thereby direct the respondents 1 to 3 to absorb the petitioner in the 1st respondent corporation as permanent employee WP No.25659 of 2016 Writ of Mandamus, Directing the respondents 1 to 3 to implement the order of the 4th respondent made in E/3145/08 dated 14.06.2010 under the provisions of the Tamilnadu Industrial Establishments (Conferment of permanent status to workmen) Act 1981 and thereby direct the respondents 1 to 3 to absorb the petitioner in the 1st respondent corporation as permanent employee WP No.

29969 of 2016 Writ of Mandamus, Directing the respondents to reinstate the petitioner in service as a permanent employees WP No.29970 of 2016 Writ of Mandamus, Directing the respondents to reinstate the petitioner in service as a permanent employees WP No.29968 of 2016 Writ of Mandamus, Directing the respondents to reinstate the petitioner in service as a permanent employees WP No.30060 of 2016 Writ of Mandamus, directing the respondents 1 to 4 to consider the petitioners representations dated 24.10.2015 for the purpose of regular employment in a time bound manner WP No.30422 of 2016 Writ of Mandamus, Directing the respondents to reinstate the petitioner in service as a permanent employee WP No.30532 of 2016 Writ of Mandamus, Directing the respondents to reinstate the petitioner in service as a permanent employee For Petitioners : Mr.I.

Abrar MD Abdullah in W.P.No.30060/2016 For R1 : Mr.D.Raghu in W.P.No.

For RR2 to 4 : Mr.G.Anand in W.P.No.30060/2016 For M/s.T.S.Gopalan & Co.

For Petitioners : Mr.N.Suresh in W.P.Nos.25656 to 25659/2016 For RR1 to 3 : Mr.G.Anand in W.P.Nos.25656 to 25659/2016 For M/s.T.S.Gopalan & Co.

For R4 : Mr.D.Raghu in W.P.Nos.25656 to 25659/2016 Government Advocate For Petitioners : Mr.M.Muthupandian in W.P.No.16591/2010 For R1 : Mr.G.Anand in W.P.No.16591/2010 For M/s.T.S.Gopalan & Co.

For R2 : Mrs.A.Sri Jayanthi in W.P.No.16591/2010 Special Government Pleader For Petitioners : Mr.S.Duraisamy in W.P.No.23814/2013 For Respondents : Mr.G.Anand in W.P.No.23814/2013 For M/s.T.S.Gopalan & Co.

For Petitioners : Mr.M.Muthupandian in W.P.No.21020/2012 For R1 : Mr.G.Anand in W.P.No.21020/2012 For M/s.T.S.Gopalan & Co.

For R2 : Mrs.A.Sri Jayanthi in W.P.No.21020/2012 Special Government Pleader For Petitioners : Mr.A.V.Raja in W.P.No.23207/2015 For Respondents : Mr.G.Anand in W.P.No.23207/2015 For M/s.T.S.Gopalan & Co.

For Petitioners : Mr.K.Chandru in W.P.Nos.29968 to 29970/2016 For Respondents : Mr.G.Anand in W.P.Nos.29968 to 29970/2016 For M/s.T.S.Gopalan & Co.

For Petitioners : Mr.K.Chandru in W.P.Nos.30422 & 30532/2016 For Respondents : Mr.G.Anand in W.P.Nos.30422 & 30532/2016 For M/s.T.S.Gopalan & Co.

O R D E R

The relief sought for in this writ petition is for a direction to implement the order, conferring permanency with time scale of pay, arrears towards difference in salary and all other attendant benefits, award costs.

2.The learned counsel appearing on behalf of the workmen made a submission that the board after 12(3)settlement dated 10.08.2007 issued orders in B.P.(Chairman)No.9, Administrative Branch, date 09.01.2008, granting permanent absorption for contract labourers, who all are not covered by 12(3) Settlement. Certain conditions are stipulated in the Board proceedings dated 09.01.2008 for granting permanent absorption. 3.The learned counsel appearing on behalf of the management made a submission that the management is not having any objection for considering the case of the workmen in the light of the terms and conditions as stipulated in B.P. No.9, dated 09.01.2008.

In view of the said submissions, the learned counsel appearing for the workmen also agreed and filed their memo stating that the case of the workmen may be considered by the management in terms of the B.P.No.9 dated 09.01.2008. 4.In this view of the matter, the workmen are permitted to submit fresh representations to the management, within a period of three(3) weeks from the date of receipt of a copy of this order, along with all necessary documents establishing their engagement as contract labourer. In the event of receiving any such representation from the workmen, the management is directed to consider the same, in the light of the Board proceedings issued dated 09.01.2008 and pass orders on merits and in accordance with law, within a period of twelve (12) weeks from the date of receipt of a copy of this order.

5.In view of the submissions made by the learned counsel appearing on behalf of the workmen, the order passed by the Inspector of Labour granting permanent status cannot be insisted upon and in the event of considering the case of the workmen in the light of the B.P.No.9 dated 09.01.2008, the orders passed by the Inspector of Labour need not be given effect to.

6.Accordingly, these writ petitions stand disposed of. Consequently, connected miscellaneous petitions are closed. However, there is no order as to costs.

Sd/- Assistant Registrar(CS-IV) //True Copy// Sub Assistant Registrar maya To 1.The Principal Secretary to Government Energy Department Govt of Tamil Nadu Secretariat, Chennai - 600 009.

2.The Chairman & Managing Director Tamil Nadu Generation and Distribution Corporation Ltd (TANGEDCO) 10th Floor, N.P.K.R.R.Maligai, 144, Anna Salai Chennai - 600 002.

3.The Chief Engineer (Personnel) Tamil Nadu Generation and Distribution Corporation Ltd (TANGEDCO) 8th Floor, Eastern Wing N.P.K.R.R.Maligai, 144, Anna Salai Chennai - 600 002.

4.The Chief Engineer/ETPS Ennore Thermal Power Station Kathivakkam High Road Ennore, Chennai - 600 057.

5.The Tamilnadu Electricity Generation & Distribution Corporation Ltd Represented by the Chairman No.144, Annasalai, Chennai - 2.

6.The Chief Engineer (Personnel) Tamilnadu Electricity Generation & Distribution Corporation Ltd No.144, Annasalai, Chennai - 2.

7.The Superintending Engineer Tamilnadu Electricity Generation & Distribution Corporation Ltd.

Tiruvannamalai.

8.The Inspector of Labour, Tiruvannamalai.

9.The Superintending Engineer Gobi Electricity Distribution Circle, TN Generation & Distribution Corporation Ltd., Gobichettipalayam 638 454.

10.The Inspector of Labour, Erode - 9.

11.The Executive Engineer Tamil Nadu Generation and Distribution Corporation Limited Sathyamangalam Division Erode District.

12. The Superintendent Engineer Operation and Maintenance (O&M) Tamil Nadu Generation and Distribution Corporation Ltd Gobichettipalayam Circle Erode District 13.The Superintending Engineer Tiruvannamalai Electricity Distribution Circle TNEB, Tiruvannamalai.

+1cc to Mr.I.ABRAR MD ABDULLAH, Advocate, S.R.No. 31102 +2cc to Mr.MUTHUPANDIAN, Advocate, S.R.No.30944 & 30945 +1cc to Mr.S.Duraisamy, Advocate SR.No.30821(20/07/2018) W.P.No.16591 of 2010 W.P.No.21020 of 2012 W.P.No. 23814 of 2013 W.P.No.23207 of 2015 W.P.Nos.25656 to 25659 of 2016 W.P.Nos.29968 to 29970 of 2016 W.P.Nos.30060, 30422 & 30532 of 2016 NRI(CO) TR(21/05/2018)