← Library
Madras High CourtWP/24267/2024disposed of

N.Radhakrishnan v. The State Of Tamil Nadu,

2024-08-27Honourable Mr Justice G.K. Ilanthiraiyan4 pages

IN THE HIGH COURT OF JUDICATURE AT MADRAS

DATED : 27.08.2024

CORAM:

THE HONOURABLE MR. JUSTICE G.K.ILANTHIRAIYAN N.Radhakrishnan ... Petitioner Vs

1. The State Of Tamil Nadu, Represented By The District Collector, Cuddalore District, Cuddalore-607 001.

2. The Block Development Officer, (Village Panchayat) Nallur Panchayat Union, Nallur-606 302.

3. The President, Pe.Ponneri Panchayat, Pe.Ponneri Village, Pennadam (Rs) Post, Tittakudi Taluk, Cuddalore District-606 111.

4. The Assistant Executive Engineer Highways (Regular), Tittagudi-606 106, Cuddalore District.

5. The Inspector Of Police, Pennadam 606 105, Cuddalore District.

... Respondents Prayer: Writ Petition filed under Article 226 of the Constitution of India, praying for issuance of a Writ of Mandamus, directing the second, third, fourth and fifth respondent namely The Block Development Officer (V.P) Nallur, The President, Pe.Ponneri Vllage Panchayat, The Assistant Executive Engineer

Highways, Tittagudi and The Inspector of Police, Pennadam, to remove the health Hazards of beef fry, pork fry and manure dumps providing clean roads as requested by the petitioner in the representation dated 28.02.2020, 23.03.2020, 23.09.2020, 05.11.2020 and 05.07.2024 with in a stipulated time as specified by this Honourable Court.

For Petitioner : Mr.C.Venkatesan For R1 and R4 : Mr.S.Arumugam Government Advocate For R2 and R3 : Mr.N.Muthuvel Government Advocate For R5 : Mr.A.Gopinath Government Advocate (Crl.side)

ORDER

This writ petition has been filed for direction directing the second, third, fourth and fifth respondent namely The Block Development Officer (V.P) Nallur, The President, Pe.Ponneri Vllage Panchayat, The Assistant Executive Engineer Highways, Tittagudi and The Inspector of Police, Pennadam, to remove the health Hazards of beef fry, pork fry and manure dumps providing clean roads as requested by the petitioner in the representation dated 28.02.2020, 23.03.2020, 23.09.2020, 05.11.2020 and 05.07.2024 within a stipulated time as specified by this Honourable Court.

2. Heard the learned counsel on either side and perused the materials available on record.

3. Without expressing any opinion on the merits of the writ petition, the second respondent is directed to consider the representations submitted by the petitioner and dispose of the same on merits and in accordance with law, within a period of twelve weeks from the date of receipt of a copy of this order.

4. With the above directions, this writ petition is disposed of. There shall be no order as to costs.

27.08.2024 Internet: Yes Index : Yes/No Speaking/Non Speaking order mn G.K.ILANTHIRAIYAN. J, mn

To

1. The State Of Tamil Nadu, Represented By The District Collector, Cuddalore District, Cuddalore-607 001.

2. The Block Development Officer, (Village Panchayat) Nallur Panchayat Union, Nallur-606 302.

3. The President, Pe.Ponneri Panchayat, Pe.Ponneri Village, Pennadam (Rs) Post, Tittakudi Taluk, Cuddalore District-606 111.

4. The Assistant Executive Engineer Highways (Regular), Tittagudi-606 106, Cuddalore District.

5. The Inspector Of Police, Pennadam 606 105, Cuddalore District.

27.08.2024