Santhi Renewable Energies P Ltd v. Tamil Nadu Generation And Distribution
IN THE HIGH COURT OF JUDICATURE AT MADRAS
DATED: 09.08.2023 CORAM: JUSTICE N.SESHASAYEE WP.No.23494 of 2023 Santhi Renewable Energies P Ltd., Villa No.3, Sreevatsa Global Village, Chinnavedampatti, Coimbatore - 641 049, Repd by its Authorised Signatory, Mr.M.Bakthavachalam
...Petitioner
-Vs1.Tamilnadu Generation and Distribution Corporation Ltd, (TANGEDCO), 10TH Floor, 144, Anna Salai, Chennai - 600 002.
Represented by its Chairman Cum Managing Director.
2.The Chief Engineer, NCES, TANGEDCO, 2nd Floor, 144, Anna Salai, Chennai - 600 002.
3.The Superintending Engineer, TANGEDCO, Theni Electricity Distribution Circle, Theni.
...Respondents
Prayer: Writ Petition is filed under Article 226 of Constitution of India, to issue a Writ of Mandamus, directing the 2nd and 3rd Respondent to 1/5
effect name transfer of Wind Fan Nos.059224760324 from M/s.Powerica Limited to the name of the Petitioner i.e., M/s.Santhi Renewable Energies P Ltd along with utility change from sale to board to group captive scheme as per the Petitioner's application dated 10.05.2023 and the 3rd Respondents No due certificate dated 24.05.2023 on payment of necessary charges.
For Petitioner : Mr.R.S.Pandiyaraj For Respondents : Mr.D.R.Arunkumar, Standing Counsel for TNEB
ORDER
The petitioner has purchased a windmill from M/s.Powerica Limited on 19.06.2023. It requires name transfer and migration from sale to TANGEDCO to capital consumption of the petitioner. The second respondent has called for a NOC from the third respondent and this too has been made available by the third respondent and the papers are now pending before the second respondent.
2.Mr.D.R.Arun Kumar, learned Standing Counsel for Tamil Nadu Electricity Board takes notice for the respondents. 2/5
3.The second respondent is now required to take a call on the representation of the petitioner for transfer and migration vis-a-vis the consumption of the energy to be generated within a period of six (6) weeks, if the papers are otherwise in order. If the second respondent contemplates any rejection of the request, it is directed that he shall give a personal audience to the petitioner's representation and shall decide the issue through a detailed speaking order.
4.The Writ Petition is disposed of accordingly. No costs. 09.08.2023 Index : Yes/No Internet : Yes/No Tsg 3/5
N.SESHASAYEE, J., Tsg To 1.Tamilnadu Generation and Distribution Corporation Ltd, (TANGEDCO), 10TH Floor, 144, Anna Salai, Chennai - 600 002.
Represented by its Chairman Cum Managing Director.
2.The Chief Engineer, NCES, TANGEDCO, 2nd Floor, 144, Anna Salai, Chennai - 600 002.
3.The Superintending Engineer, TANGEDCO, Theni Electricity Distribution Circle, Theni.
Order made in 4/5