← Library
Madras High CourtCMP/22389/2025ordered

The Chairman v. Sri Pathy Associates

2025-09-18Honourable Dr Justice G. Jayachandran,Honourable Mr.Justice Mummineni Sudheer Kumar3 pages

CMP NO. 22389 of 2025

IN THE HIGH COURT OF JUDICATURE AT MADRAS

DATED: 18-09-2025

CORAM

THE HONOURABLE DR JUSTICE G. JAYACHANDRAN AND THE HONOURABLE MR.JUSTICE MUMMINENI SUDHEER KUMAR CMP NO. 22389 of 2025 IN ARB APPEAL NO. 14 OF 2025 The Chairman Anna Nagar, Nellithoppe, PuducherryPuducherry Housing Board, Anna Nagar, Nellithoppe, Puducherry - 605 005 and 2 Others Appellant(s) Vs Sri Pathy Associates Anna Nagar, Nellithoppe, Puducherryrep by its Managing Partner, Civil Engineering contractors , No.62, Thanga Perumal koil STreet, Erode - 638 001 Respondent(s) For Appellant(s):

Naveen TM T.M. Naveen m.gopi a.alfiya For Respondent(s):

ORDER

(Order of the Court was made by the Hon'ble G.Jayachandran J.) On 14.08.2025, this Court granted conditional stay, directing the appellant to deposit a sum of Rs.23,40,000/- on or before 04.09.2025 to the credit of the appeal.

2. The present application is filed seeking extension of time, stating that due to administrative delay in the Government, the conditional order could not be complied within the specified time. It is now stated that a cheque for a sum of Rs.23,40,000/- dated 10.09.2025, drawn in favour of the Registrar (General), Madras High Court, has been made ready, and the petitioner/ appellant seeks permission to deposit the same in compliance with the conditional order dated 14.08.2025, by extending the time for compliance.

3. The Original cheque drawn in favour of the Registrar (General), Madras High Court is produced before this court along with the covering letter.

4. Considering the fact that the cheque for a sum of Rs.23,40,000/- has been made ready for deposit, the delay in complying with the conditional order is condoned.

5. The petitioner/ appellant is directed to deposit the cheque on or before 22.09.2025. Accordingly, this Civil Miscellaneous Petition is ordered.

6. Post the Arbitration Appeal for final hearing on

14.10.2025.

(G.JAYACHANDRAN J.) (MUMMINENI SUDHEER KUMAR J.) 18-09-2025 skr To

1. Sri Pathy Associates Anna Nagar, Nellithoppe, Puducherryrep by its Managing Partner, Civil Engineering contractors , No.62, Thanga Perumal koil STreet, Erode - 638 001