← Library
Madras High CourtWP/37145/2024disposed of

N.Subramanian v. The Commissioner

2025-04-21Honourable Mr Justice S. M. Subramaniam,Honourable Mr.Justice K.Rajasekar6 pages

IN THE HIGH COURT OF JUDICATURE AT MADRAS

DATED: 21-04-2025

CORAM

THE HONOURABLE MR JUSTICE S. M. SUBRAMANIAM AND THE HONOURABLE MR.JUSTICE K.RAJASEKAR

1. N.Subramanian S/o.V.Nagalingam, Res.At No.1, N.S.K.Street, V.O.C.Nagar, Pammal, Chennai-600 075 Petitioner(s) Vs

1. The Commissioner Tambaram Corporation, Tambaram, Chennai600 045, Tamilnadu 2.The Chennai Metropolitan Development Authority Thalamuthu Natarajan Building, No.1, Gandhi Irwin Road, Egmore, Chennai600 008 3.Tamilnadu Real Estate Regulatory Authority st floor, TNRERA, No.1, Gandhi Irwin Road, Egmore, Chennai-600 008

4.Asset Tree Homes No.20, 2nd Floor, Zion Complex, Muthamizh Nagar, Pammal, Chennai-600 075 Respondent(s) PRAYER directing the 1 st , 2 nd and 3 rd respondents to consider the Letter sent by the petitioner dated 06.09.2024, 18.10.2024 and consequently restrain the 4 th respondent from carrying out any construction in violation of obtaining approval.

For Petitioner(s):

Mr.Aravindh Subramanian, Senior Counsel for Mr.Kannamai. ME For Respondent(s):

Mr.P.Srinivas Standing Counsel for R1 Mr.C.Manoharan Standing Counsel for CMDA for R2 Mr.Vadivelu Deenadayalan Additional Government Pleader for R3 Mr.K.A.Ravindran for Mr.S.Vijayakumar for R4

ORDER

(Order of the Court was made by S.M.Subramaniam J.) The Writ Petition on hand has been instituted to direct the 1 st , 2 nd and 3 rd respondents to consider the Letter sent by the petitioner dated 06.09.2024, 18.10.2024 and consequently, restrain the 4 th respondent from carrying out any construction in violation of obtaining approval.

2.

With reference to the complaint made by the petitioner, the Commissioner, Tambaram Corporation, Tambaram filed a counter affidavit. Paragraph Nos. (12), (13) and (14) of the counter affidavit reads as follows, "12. In regard to the averments in para 11 to 19 it is submitted that the issue of the building violations as alleged by the petitioner have been taken into account and after the inspection on 21-12-2024, the notice for the deviation from the plan has been issued to the 4th respondent by proceedings dated 27-122024 and the construction has been stopped. Now after the defects as pointed out are rectified, the construction will be permitted. Until such time the construction will not be permitted.

13. In Plot 1 and 2 alone the building has been constructed upto the ground floor roof and the deviations were found out and notices have been issued. In the other buildings, the stage is in the foundation itself. Therefore it is possible for the 4th respondent to rectify the defects. Only after doing so, the 4th respondent will be permitted to carry out the rest rest of the construction.

14. On receipt of the reply from the 4th respondent after the defects are rectified, the building will be once again inspected and the work will either be permitted or stopped as the case may be and further action will be undertaken in a time bound manner."

3.

In paragraph No.(14), it is stated that the 4 th respondent will rectify the deviation and only after such rectification, further construction will be

permitted. Thus, the 4 th respondent is directed not to continue the further construction of building without rectifying the deviation and after inspection by the Commissioner, Tambaram Corporation. It is made clear that the authorities of the Tambaram Corporation also shall verify the further construction, if any made by the 4 th respondent. In the event of any unauthorised construction or further deviation, all appropriate actions are directed to be initiated in accordance with law.

4.

Accordingly, the Writ Petition stands disposed of. No costs. Consequently, the connected Miscellaneous Petitions, if any, are closed. (S.M.SUBRAMANIAM J.)(K.RAJASEKAR J.) 21-04-2025 gd Index:Yes/No Speaking/Non-speaking order Internet:Yes

To 1.The Commissioner Tambaram Corporation, Tambaram, Chennai-600 045, Tamilnadu 2.The Chennai Metropolitan Development Authority Thalamuthu Natarajan Building, No.1, Gandhi Irwin Road, Egmore, Chennai600 008 3.Tamilnadu Real Estate Regulatory Authority 1stfloor, Tnrera, No.1, Gandhi Irwin Road, Egmore, Chennai-600 008 4.Asset Tree Homes No.20, 2nd Floor, Zion Complex, Muthamizh Nagar, Pammal, Chennai600 075

S.M.SUBRAMANIAM J.

AND K.RAJASEKAR J.

gd 21-04-2025