Madras High CourtWP/39246/2024disposed of

Lakshmi v. The Executive Engineer

2025-01-02Honourable Mr Justice S. Sounthar5 pages

IN THE HIGH COURT OF JUDICATURE AT MADRAS

DATED : 02.01.2025

CORAM

THE HONOURABLE MR.JUSTICE S.SOUNTHAR Lakshmi ... Petitioner vs.

1.The Executive Engineer Operation And Distribution, The Tamil Nadu Generation And Corporation Limited, Seeranaicken Palayam, Coimbatore.

2.The Assistant Executive Engineer Operation And Distribution, The Tamil Nadu Generation And Corporation Limited, Perur, Coimbatore.

3.The Assistant Engineer Operation And Distribution, The Tamil Nadu Generation And Corporation Limited, Kalampalayam Coimbatore.

4.K.P.Rangasamy, ..Respondents PRAYER: Writ Petition is filed under Article 226 of the Constitution of India, to issue a Writ of Mandamus, directing the respondent No.3 to consider the petitioner representation dated 12.6.2024 for restoration of her name in the name electricity service connection bearing No.104-00-1554 in view of letter dated 20.06.2024 vide proceedings in Ka.No. UuMepo/ V/ Kaa.Pa/ Ko.Pugar/ A.No.87 / 2024 on the file of 3rd respondent within a time bound manner.

1/5

For Petitioner : Mr.K.Myilsamy For Respondents1 to 3 : Mr.L.Jai Venkatesh Standing Counsel (TNEB)

O R D E R

By consent of both the learned counsel appearing for the petitioner as well as respondents, this writ petition is disposed of at the admission stage itself.

2. The petitioner herein seeks a direction to 3rd respondent to consider her representation dated 12.06.2024 seeking restoration of power connection bearing service connection No.104-00-1554.

3. It is the case of the petitioner that she is residing at New Door No.1/143 (Old Door No.1/56) Vinayakar Koil Street, Kalampalayam, Theethipalayam, Perur Taluk, Coimbatore District. The petitioner obtained electric service connection bearing service connection No.104-00-1554 from the official respondents. The service connection was dis-connected based on the representation submitted by the 4th respondent claiming right 2/5

over the property. The disconnection was effected without affording opportunity to the petitioner. Therefore, she submitted a representation before the 3rd respondent on 12.06.2024 seeking re-connection. In response to the representation, the 3rd respondent sent a letter to the petitioner on 20.06.2024 in his proceedings in Ka.No.UuMepo/V/Kaa.Pa/Ko.Pugar/ A.No.87/2024 directing the petitioner to produce revenue documents in respect of the said property.

4. The learned counsel for the petitioner submits that in spite of the fact that petitioner produced all the documents, the respondents have not considered her request for re-connection.

5. Mr.L.Jai Venkatesh, learned Standing Counsel (TNEB), who takes notice for the respondents 1 to 3, submits that in response to the letter issued by the 3rd respondent dated 20.06.2024, the petitioner failed to furnish the documents required by the respondents. Therefore, her request has not been considered.

3/5

6. In view of the said statement made by the learned Standing Counsel (TNEB) for the official respondents, this Court is inclined to direct the petitioner to furnish all the documents mentioned by the 3rd respondent in his letter dated 20.06.2024 within a periods of two weeks from the date of receipt of copy of this order. The 3rd respondent shall consider the same and pass final orders on merits on the representation of the petitioner dated 12.06.2024 within a further period of six weeks thereafter.

7. With the above directions, the Writ Petition stands disposed of. No costs.

02.01.2025 Index:Yes/No Internet:Yes/No nr 4/5

S.SOUNTHAR, J.

nr To 1.The Executive Engineer Operation And Distribution, The Tamil Nadu Generation And Corporation Limited, Seeranaicken Palayam, Coimbatore.

2.The Assistant Executive Engineer Operation And Distribution, The Tamil Nadu Generation And Corporation Limited, Perur, Coimbatore.

3.The Assistant Engineer Operation And Distribution, The Tamil Nadu Generation And Corporation Limited, Kalampalayam Coimbatore.

02.01.2025 5/5