← Library
Madras High CourtA/6161/2025ordered

M/S.Era Infra Engineering Ltd (Eiel), v. Bharat Heavy Electricals Limited.,

2025-12-10Honourable Mr Justice N. Anand Venkatesh4 pages

IN THE HIGH COURT OF JUDICATURE AT MADRAS

DATED: 10-12-2025

CORAM

THE HONOURABLE MR JUSTICE N. ANAND VENKATESH AND A SR NO. 180328 OF 2025

1. M/s.Era Infra Engineering Ltd (EIEL), Through its Authorized Representative, C-56/41, Sector 62, Noida, Uttar Pradesh 201 301.

Applicant(s) Vs Bharat Heavy Electricals Limited., Power Sector Southern Region, 690, Anna Salai, Nandanam, Chennai - 600 035.

Respondent(s) A SR No. 180328 of 2025

1. Era Infra Engineering Ltd C 56/41, Sector 62, Noida, Uttar Pradesh 201301 Applicant(s) Vs

1. Bharat Heavy Electricals Limited C 56/41, Sector 62, Noida, Uttar Pradesh 201301 Respondent(s)

PRAYER to condone the delay of 41 days in representation of Application (D) No.180328 of 2025 E-filing No. ATN20220012600C202500004. A SR No. 180328 of 2025 PRAYER It is most humbly prayed that this Court may be pleased to pass an order of granting a period of further 6 months extension of time in the Arbitration matter For Applicant(s):

M/s.V.Sivabalan For Respondent(s):

ORDER

This application has been filed to condone the delay of 41 days in re-presenting the application in Application (D) No.180328 of 2025.

2.

Heard the learned counsel for the petitioner. 3.

This Court having satisfied with the reasons stated in the accompanying affidavit filed in support of this application, this application is ordered.

4.

The Registry is directed to number the main Application and list the same for hearing.

10-12-2025 rka Index:Yes/No Speaking/Non-speaking order Internet:Yes

N.ANAND VENKATESH J.

rka To 1.Bharat Heavy Electricals Limited., Power Sector, Southern Region, 690, Anna Salai, Nandanam, Chennai - 600 035.

In A DR NO. 180328 OF 2025 10-12-2025