Sundaram Industries Ltd., v. Tamil Nadu Generation And
BEFORE THE MADURAI BENCH OF MADRAS HIGH COURT DATED: 06.07.2022
CORAM
THE HON'BLE MR.JUSTICE R.VIJAYAKUMAR and M.P(MD)Nos.1, 2 & 3 of 2012 Sundaram Industries Limited, Represented by its President & Secretary, Registered Office at TVS Building, 7-B, West Veli Street, Madurai-625 001.
... Petitioner Vs.
1.Tamil Nadu Generation and Distribution Corporation Limited (TANGEDCO), Represented by its Chairman & Managing Director, 2.The Chief Engineer/Commercial, Tamil Nadu Generation and Distribution Corporation Limited (TANGEDCO), 3.The Superintending Engineer, Metro/Madurai Electricity Distribution Circle, Tamil Nadu Generation and Distribution, Corporation Limited (TANGEDCO).
1/4
4.The State Load Dispatch Centre, Represented by its Director-Operations, ... Respondents PRAYER : Writ Petition filed under Article 226 of the Constitution of India, praying this Court to issue a Writ of Certiorarified Mandamus, calling for the records of the third respondent pertaining to communication bearing Lr.No.SE/MEDC/METRO/MDU/DFC/AO/ Rev./HT/AS/F.NOC/D.No.80/2012, dated 30.07.2012, quash the same and direct the respondents not to deny any facility to the petitioner for their HT SC No.44 on grounds which are not specifically authorized under the TNERC Open Access Regulations, 2005. For Petitioner : Mr.S.Anand Chandrasekar for M/s.Sarvabhauman Associates For Respondents : Mr.S.Deenadhayalan Standing Counsel
ORDER
The present Writ Petition has been filed challenging an order passed by the respondent Electricity Board, under which, they refused to grant NOC for procurement of power from third parties citing pendency of two writ petitions.
2/4
2. The learned Counsel appearing for the respondents had received written instructions from the TANGEDCO to the effect that both the writ petitions have been disposed of and NOC is being regularly granted to the petitioner's industry. The same is recorded. Nothing survives to be adjudicated in the present writ petition.
3. The Writ Petition stands disposed of. No costs. Consequently, connected Miscellaneous Petitions are closed. 06.07.2022 Index :
Yes / No Internet :
Yes / No btr To 1.The Chairman & Managing Director, Tamil Nadu Generation and Distribution Corporation Limited (TANGEDCO), 2.The Chief Engineer/Commercial, Tamil Nadu Generation and Distribution Corporation Limited (TANGEDCO), 3/4
R.
VIJAYAKUMAR ,J.
btr 3.The Superintending Engineer, Metro/Madurai Electricity Distribution Circle, Tamil Nadu Generation and Distribution, Corporation Limited (TANGEDCO).
4.The Director-Operations, The State Load Dispatch Centre, Order made in 06.07.2022 4/4