Senthilkumar .A v. The Superintending Engineer
BEFORE THE MADURAI BENCH OF MADRAS HIGH COURT DATED : 20.03.2024
CORAM
THE HONOURABLE MR.JUSTICE G.R.SWAMINATHAN and W.M.P.(MD)Nos.924, 926 and 5476 of 2024 A.Senthilkumar ... Petitioner Vs.
1.The Superintending Engineer, General Construction Circle, Transmission Line Construction, TANGEDCO, K.Pudur, Madurai.
2.The Superintending Engineer,, Wind Farm Project, TANGEDCO, Tirunelveli.
3.The Executive Engineer, Wind Farm Project, TANTRANSCO, Tirunelveli.
4.The Executive Engineer, Wind Farm Project, TANGEDCO, Tirunelveli.
5.The District Collector, Tuticorin District, Tuticorin.
6.M/s.JSW Renew Energy Private Limited, Rep. its Through Assistant Vice President, 1/4
No.23, 7th Street, Perumalpuram, Vasantha Nagar, Thirunelveli District.
... Respondents Prayer : Writ Petition filed under Article 226 of the Constitution of India, praying this Court to issue a Writ of Mandamus, forbearing the respondents 1 to 4 from granting the order for commissioning of Wind Mill in favour of the 6th respondent to transmit electricity though the High Tension electric tower and overhead lines over the petitioner's lands situated in S.No.157/2C, in Patta No.1851 to an extent of 1 acre 27 cents at Virusampatti village, Vilathikulam taluk, Tuticorin District.
For Petitioner : Mr.M.Karthikeya Venkitachalapathy For Respondents : Mr.K.S.Selvaganeshan, Addl. Government Pleader for R5.
Mr.S.Deenadhayalan, Standing Counsel for R1 to R4.
Mr.N.Dilip Kumar for R6.
ORDER
The learned counsel for the petitioner seeks permission of this Court to withdraw this writ petition and also made an endorsement to that effect. 2/4
2.Permission granted. This writ petition is dismissed as withdrawn. No costs. Consequently, connected miscellaneous petitions are closed. 20.03.2024 NCC : Yes/No Index : Yes / No Internet : Yes/ No ias To:- The District Collector, Tuticorin District, Tuticorin.
3/4
G.R.SWAMINATHAN, J.
ias 20.03.2024 (2/3) 4/4