R.Jagannathan, v. The Chief Engineer
1 W.M.P.(MD)NO.1790 OF 2020 BEFORE THE MADURAI BENCH OF MADRAS HIGH COURT DATED: 05-03-2026
CORAM
THE HONOURABLE MR JUSTICE G.R.SWAMINATHAN AND THE HONOURABLE MS.JUSTICE R. POORNIMA WMP(MD) NO. 1790 of 2020 IN W.P.(MD)No.25029 of 2018
1. R.Jagannathan, S/o.R.Rangarajan No.112 East Chitra Street Srirangam Tiruchirapalli-620 006.
Petitioner(s) Vs
1. The Chief Engineer (constn.And Maintenance) Integrated Chief Engineers Office Hrs Campus76 Sardar Patel Road Guindy Chennai-25.
2. The Divisional Engineer (construction And Maintenance) Tiruchirappalli-620 020.
3. The Assistant Divisional Engineer Construction And Maintenance Tiruchirapalli-620 020.
1/3
2 W.M.P.(MD)NO.1790 OF 2020
4. The District Collector Collector's Office Compound Tiruchirapalli-620 001.
Respondent(s) For Petitioner(s): Mr.K.S.Vamsidhar Prayer:to extend the time granted by this Honble Court in wp(md).25029/2018 dt 19.12.2018 for making fresh representation to the respondents by a further time of 4 weeks from today
ORDER
Due to efflux of time, nothing survives for further adjudication. This petition is dismissed accordingly.
(G.R.SWAMINATHAN J.) (R.POORNIMA J.) 05-03-2026 PMU To
1. The Chief Engineer (constn. And Maintenance) Integrated Chief Engineers Office Hrs Campus 76 Sardar Patel Road Guindy Chennai-25.
2. He Divisional Engineer (construction And Maintenance) Tiruchirappalli-620 020.
2/3
3 W.M.P.(MD)NO.1790 OF 2020
3. The Assistant Divisional Engineer Construction And Maintenance Tiruchirapalli-620 020.
4. The District Collector Collectors Office Compound Tiruchirapalli-620 001.
3/3