← Library
Madras High CourtCONT P(MD)/425/2021closed

E. Haroon Natharsha v. Vishnu

2024-12-13Honourable Mr Justice M.S. Ramesh,Honourable Dr.Justice A.D.Maria Clete5 pages

BEFORE THE MADURAI BENCH OF MADRAS HIGH COURT DATED : 13.12.2024 CORAM :

THE HONOURABLE MR.JUSTICE M.S.RAMESH and THE HONOURABLE DR.JUSTICE A.D.MARIA CLETE E.Haroon Natharsha ... Petitioner vs.

1. Mr.Vishnu, The District Collector, O/o. the District Collector,

2. Mr.Shanmuga Moorthy, The Divisional Engineer, O/o. the Divisional Engineer, Tamil Nadu Highways Department, (Construction and Maintenance),

3. Mr.S.Krishnasamy, The Assistant Divisional Engineer, O/o. The Assistant Divisional Engineer, Tamil Nadu Highways Department, (Construction and Maintenance), Palayamkottai, Tirunelveli.

4. Mr.Abiraminathan, The Assistant Engineer, O/o. The Assistant Engineer, Tamil Nadu Electricity Board, Page No.1 of 5

5. Mr.Bagavathy Perumal, The Tahsildar, O/o. the Tahsildar, Tirunelveli Taluk Office,

6. Mr.Muthu Krishnan, The District Surveyor, O/o. the District Surveyor, ... Respondents Prayer : Petition filed under Section 11 of the Contempt of Courts Act, 1971, to initiate contempt proceedings under Section 11 of the Contempt of Courts Act, 1971, against the Contemnors herein, for their willful disobedience to the order passed by this Honourable Court in WP(MD)No.1484 of 2021, dated 27.01.2021, and punish them accordingly.

For Petitioner : No appearance For R1 to R3 : Mr.S.Shaji Bino Special Government Pleader For R4 : Mr.Johnny Basha

ORDER

(Order of the Court was made by M.S.RAMESH, J.) Alleging disobedience of the order passed by this Court in W.P(MD)No.1484 of 2021, dated 27.01.2021, this Contempt Petition has been filed.

Page No.2 of 5

2.

There is no representation for the petitioner. 3.

According to the learned Special Government Pleader, there are no encroachments in Survey No.592, which is classified as a Thoppu Manthai Poramboke. However, there were some encroachments in Survey No.591/1, which were removed, by following the due process of law.

4.

In view of the same, no further orders are required to be passed in this contempt petition. Accordingly, the Contempt Petition stands closed.

(M.S.R, J.) (A.D.M.C, J.) 13.12.2024 Index : Yes / No bala To

1. Mr.Vishnu, The District Collector, O/o. the District Collector, Page No.3 of 5

2. Mr.Shanmuga Moorthy, The Divisional Engineer, O/o. the Divisional Engineer, Tamil Nadu Highways Department, (Construction and Maintenance),

3. Mr.S.Krishnasamy, The Assistant Divisional Engineer, O/o. The Assistant Divisional Engineer, Tamil Nadu Highways Department, (Construction and Maintenance), Palayamkottai, Tirunelveli.

4. Mr.Abiraminathan, The Assistant Engineer, O/o. The Assistant Engineer, Tamil Nadu Electricity Board,

5. Mr.Bagavathy Perumal, The Tahsildar, O/o. the Tahsildar, Tirunelveli Taluk Office,

6. Mr.Muthu Krishnan, The District Surveyor, O/o. the District Surveyor, Page No.4 of 5

M.S.RAMESH, J.

and A.D.MARIA CLETE, J.

bala ORDER MADE IN DATED : 13.12.2024 Page No.5 of 5