Bhoominathan v. The District Collector
BEFORE THE MADURAI BENCH OF MADRAS HIGH COURT DATED: 20.06.2023
CORAM
THE HONOURABLE Ms.JUSTICE P.T.ASHA and W.M.P.(MD) No.3203 of 2020 Bhoominathan ... Petitioner /vs./ 1.The District Collector, Sivagangai District, Sivagangai.
2.The Superintending Engineer, Podhu Nirmana Vattam (Public Construction Circle), Race Course Road, K.Pudur, Madurai 625 007.
3.The Executive Engineer, Transmission Line Construction, TANTRANSCO/TNEB, Virudhunagar.
4.The Assistant Engineer, Transmission Line Construction, TANTRANSCO/TNEB, Virudhunagar.
1/5
5.Shanmugam ... Respondents PRAYER: Writ Petition filed under Article 226 of the Constitution of India for issuance of Writ of Mandamus, directing the respondents No.1 to 4 to appoint experts to ascertain the proper location (Centre Point) for each Transmission Tower or Pole to be fixed in and around petitioner's land bearing Survey Nos.7/5 and 7/16 of Parathikanmai village Group, Kalayarkovil Taluk, Sivagangai District thereafter erect the said Transmission Tower or Pole on the above mentioned petitioner's lands.
For Petitioner : Mr.V.R.G.Mohan For R1 : Mr.A.Sivanupandian Government Advocate For R2 to R4 : Mr.S.Deenadhayalan Standing Counsel For R5 : Mr.M.Vivekanaden
ORDER
The above writ petition is filed for the issue of a Writ of Mandamus directing the respondents 1 to 4 to appoint experts to ascertain the proper location (Centre Point) for each transmission tower or pole to be fixed in and around petitioner's land bearing S.Nos.7/5 and 7/16 at Parathikanmai village Group, Kalayarkovil Taluk, Sivagangai District and thereafter erect the said transmission tower or pole on the above mentioned lands.
2/5
2.The petitioner is aggrieved by the fact that the transmission pole, which was originally proposed to be erected between the lands of the petitioner and the fifth respondent was moved more into the petitioner's land. 3.It is informed that the line has been laid in 2020 and what remains is only the commissioning of the electric supply. Pursuant to the order of this Court dated 05.06.2023, the respondents 1 to 4 were directed to produce the working sheet pertaining to the erection and also the sketch showing the route map of the transmission lines.
4.The sketch signed on 11.09.2018 has been produced showing the route, through which 110 KV SC line between Kalayarkovil and Maravamangalam was to be laid. The profile and route map have also been prepared as early as in the month of May, 2018. It is informed by the respondents 2 to 4 that the erection has taken place only in keeping with this route map. However, it is admitted that 287 sq.mts., of the petitioner's land has been taken for erecting the high tension tower. 3/5
5.In the light of the above, the Writ Petition is disposed of with liberty to the petitioner to move the respondents 1 to 4 for compensation for the said extent of 287 sq.mts. However, there shall be no order as to costs. Consequently, connected Miscellaneous Petition is closed.
Speaking : Yes / No 20.06.2023 NCC : Yes / No Internet : Yes / No Index : Yes / No mm To The District Collector, Sivagangai District, Sivagangai.
4/5
P.T.ASHA, J.
mm 20.06.2023 5/5