Madras High CourtWP(MD)/4405/2024disposed of

Subramanian S v. The Chief Engineer

2024-11-28Honourable Mrs Justice L.Victoria Gowri4 pages

BEFORE THE MADURAI BENCH OF MADRAS HIGH COURT DATED : 28.11.2024

CORAM:

THE HONOURABLE MRS.JUSTICE L.VICTORIA GOWRI S.Subramanian ... Petitioner Vs.

1.The Chief Engineer, Tamil Nadu Generation and Distribution Corporation Ltd., (TANGEDCO), No.144, Annasalai, Chennai-600 002.

2.The Administrative Engineer, Tamil Nadu Generation and Distribution Corporation Ltd., (TANGEDCO), No.132, Ettayapuram Road, Thoothukudi-628 101.

3.The Assistant Engineer, Tamil Nadu Generation and Distribution Corporation Ltd., (TANGEDCO) Pudukottai, Thoothukudi District-628 103.

... Respondents PRAYER : Writ Petition filed under Article 226 of the Constitution of India for issuance of a Writ of Mandamus, directing the respondents to remove the Electricity Transmission wire across above petitioner's middle of the Plot No. 1/4

43, in Survey No.175/2B in total extent of 10.424 cent in Ayyanadaippu Village, Thoothukudi District consider the petitioner's representation dated 29.12.2023 within the time stipulated by this Court. For Petitioner : Mr.K.Chinraj For Respondents : Mr.S.Deenadhayalan Standing Counsel

ORDER

The prayer in the Writ Petition reads as follows:- "To issue a Writ of Mandamus, directing the respondents to remove the Electricity Transmission wire across above the petitioner's middle of the Plot No.43, in Survey No.175/2B, situated at Ayyanadaippu Village, Thoothukudi District by considering the petitioner's representation, dated 29.12.2023. "

2. Heard the learned counsel on both sides and carefully perused the entire materials available on record.

3. When the matter came up for hearing, Mr.S.Deenadhayalan, learned Standing Counsel appearing for the respondents, on instructions, would submit that already the petitioner has remitted the required fees to the respondents for removing the Electricity Transmission wire across the petitioner's plot. 2/4

4. Recording the submission made by the learned Standing Counsel appearing for the respondent, this writ petition is closed. The respondents are directed to remove the Electricity Transmission wire across the petitioner's plot within a period of fifteen days from the date of receipt of a copy of this Order. If the Electricity Transmission wire is not removed by the respondents within the time stipulated by this Court, the petitioner is at liberty to reopen the writ petition. There shall be no order as to costs. 28.11.2024 NCC : Yes / No Index : Yes / No am 3/4

L.VICTORIA GOWRI, J.

am Order made in Dated 28.11.2024 4/4