Murugendran.P v. The Superintending Engineer
BEFORE THE MADURAI BENCH OF MADRAS HIGH COURT DATED : 28.02.2023
CORAM
THE HONOURABLE MR.JUSTICE G.R.SWAMINATHAN P.Murugendran ... Petitioner Vs.
1.The Superintending Engineer, Tamil Nadu Generation and Distribution Corporation, (TANGEEDCO), Dindigul Electricity Distribution Circle, Dindigul.
2.The Assistant Engineer, Tamil Nadu Generation and Distribution Corporation, (TANGEEDCO), N.G.O. Colony, Dindigul.
... Respondents Prayer : Writ Petition filed under Article 226 of the Constitution of India, praying this Court to issue a Writ of Mandamus, to direct the respondents to provide electricity (new connection) to the petitioner's lands situated in Survey No.966/2A, in Paraipatti, Kulathur Village, Vedasandur Taluk, Dindigul District based on the petitioner's representation dated 09.02.2023 within a time frame as stipulated by this Court.
1/4
For Petitioner : Mr.S.Sarvagan Prabhu For Respondents : Mr.S.Deenadhayalan, Standing Counsel.
ORDER
Heard the learned counsel on either side.
2.The first respondent is directed to dispose of the petition mentioned representation on merits and in accordance with law within a period of twelve weeks from the date of receipt of a copy of this order. I make it clear that I have not gone into the merits of the matter. The first respondent shall put the interested persons, if any, on notice before passing final order. It is open to the first respondent to pass order one way or the other. 3.The writ petition is disposed of accordingly. No costs. 28.02.2023 NCC : Yes/No Index : Yes / No Internet : Yes/ No ias 2/4
3/4
G.R.SWAMINATHAN, J.
ias 28.02.2023 4/4