BEFORE THE MADURAI BENCH OF MADRAS HIGH COURT DATED : 25.04.2025

CORAM:

THE HONOURABLE MR. JUSTICE BATTU DEVANAND W.P.(MD)No.7267 of 2025 and W.M.P(MD)No.5481 of 2025 M.Gurusamy

...Petitioner

Vs.

1.The Chief Engineer / Personnel (FAC), Tamil Nadu Generation and Distribution Corporation Limited / Tamil Nadu Power Distribution Corporation Ltd., NPKRR Maaligai, No.144, Anna Salai, Tamil Nadu Electricity Board, Chennai - 600 002.

2.The Superintendent Engineer, Tamil Nadu Generation and Distribution Corporation Limited / Tamil Nadu Power Distribution Corporation Ltd., Virudhunagar Electricity Distribution Circle, Virudhunagar District.

3.The Assistant Executive Engineer (Operation & Maintenance), Seithur Post, Rajapalayam Taluk, Virudhunagar District.

...Respondents

1 / 4

Prayer: Writ Petition is filed under Article 226 of the Constitution of India, in the nature of a Writ of Mandamus to direct the respondents 2 and 3 to permit the petitioner to join at Rajapalayam as per orders of the 1st respondent made in Memo No.1000002650/008319/G.11/G. 112/2025-1 dated 06.02.2025, issued in accordance with (Rt) CMD / TANGEDCO Proceedings No.5 Administrative Branch dated 28.06.2017. For Petitioner : Mr.M.Saravanakumar For Respondents : Mr.B.Ramanathan Standing Counsel

O R D E R

The learned Standing Counsel appearing for the respondents on instructions submits that the relief sought by the petitioner in the present writ petition is already granted by the respondents by issuing proceedings dated 02.04.2025 and in view of the same, no further adjudication is required in the present writ petition.

2. Learned counsel for the petitioner also submits that the relief sought in the writ petition is already granted by the respondents. 2 / 4

3. In view of the above factual position, no further adjournment or orders required in the present case.

4. Accordingly, this writ petition is closed.

5. Consequently, connected miscellaneous petition is closed.

6. There shall be no order as to costs.

25.04.2025 Index : Yes / No Internet : Yes / No NCC : Yes / No pnn 3 / 4

BATTU DEVANAND, J.

pnn To 1.The Chief Engineer / Personnel (FAC), Tamil Nadu Generation and Distribution Corporation Limited / Tamil Nadu Power Distribution Corporation Ltd., NPKRR Maaligai, No.144, Anna Salai, Tamil Nadu Electricity Board, Chennai - 600 002.

2.The Superintendent Engineer, Tamil Nadu Generation and Distribution Corporation Limited / Tamil Nadu Power Distribution Corporation Ltd., Virudhunagar Electricity Distribution Circle, Virudhunagar District.

3.The Assistant Executive Engineer (Operation & Maintenance), Seithur Post, Rajapalayam Taluk, Virudhunagar District.

W.P.(MD)No.7267 of 2025 and W.M.P(MD)No.5481 of 2025 25.04.2025 4 / 4