W.P.(MD)No.6695 of 2020 BEFORE THE MADURAI BENCH OF MADRAS HIGH COURT DATED: 07.07.2020

CORAM:

THE HONOURABLE MR.JUSTICE G.R.SWAMINATHAN W.P.(MD)No.6695 of 2020 and W.M.P.(MD)No.6057 of 2020 K.Sandhana Karuppusamy ... Petitioner Vs 1.The Chief Engineer, Madurai Electricity Distribution Circle, TANGEDCO, K.Pudur, Madurai District.

2.The Superintending Engineer (Operation/Transmission), Madurai Electricity Distribution Circle, TANGEDCO, K.Pudur, Madurai District.

3.The Superintending Engineer, Power Grid Corporation Control (Tower Erection), Madurai Electricity Distribution Circle, TANGEDCO, K.Pudur, Madurai District.

... Respondents PRAYER: Petition filed under Article 226 of the Constitution of India to issue a Writ of Mandamus, forbearing the respondents, their men, agents or servants or anybody claiming right through them from in any manner drawing high tension power supply cable and wires or otherwise in the petitioner agricultural lands comprised in S.Nos.67/4A, 69/1B and 69/1D, whereas 67/4A measuring to an extent of 0.14.50 hectare, 69/1B measuring to an extent of 0.18.00 hectare and 69/1D measuring to an extent of 0.40.0 hectare in Chithlangudi Village, Vadipatti Taluk, Madurai District. For Petitioner : Mr.M.Thirunavukkarasu For Respondents : Mrs.Rajeswari for Mr.S.M.S.Johny Basha https://hcservices.ecourts.gov.in/hcservices/ 1/2

W.P.(MD)No.6695 of 2020

ORDER

The learned counsel on either side states that the matter has become infructuous. The writ petition closed accordingly. The rights of the petitioner to claim compensation are left open. No costs. Consequently, connected miscellaneous petition is closed. Sd/- Assistant Registrar (RECORDS) // True Copy // / /2020 Sub Assistant Registrar(CS) ias Note : In view of the present lock down owing to COVID-19 pandemic, a web copy of the order may be utilized for official purposes, but, ensuring that the copy of the order that is presented is the correct copy, shall be the responsibility of the advocate/litigant concerned.

TO 1.The Chief Engineer, Madurai Electricity Distribution Circle, TANGEDCO, K.Pudur, Madurai District.

2.The Superintending Engineer (Operation/Transmission), Madurai Electricity Distribution Circle, TANGEDCO, K.Pudur, Madurai District.

3.The Superintending Engineer, Power Grid Corporation Control (Tower Erection), Madurai Electricity Distribution Circle, TANGEDCO, K.Pudur, Madurai District.

W.P.(MD)No.6695 of 2020 07.07.2020 KM (14.07.2020) 2P 4C https://hcservices.ecourts.gov.in/hcservices/ 2/2