← Library
Madras High CourtWP(MD)/15972/2015disposed of

A.Chandra v. The Executive Engineer

2017-01-23Honourable Mr Justice S. Vaidyanathan2 pages

BEFORE THE MADURAI BENCH OF MADRAS HIGH COURT DATED : 23.01.2017 CORAM :

THE HONOURABLE MR.JUSTICE S.VAIDYANATHAN W.P(MD)No.15972 of 2015 A.Chandra ... Petitioner vs.

1)The Executive Engineer, O/o. of Tamilnadu Generation and Distribution Corporation Limited(TNGEDCO), Sankarankovil, Tirunelveli District.

2)The Assistant Engineer, O/o. of Tamilnadu Generation and Distribution Corporation Limited(TNGEDCO) (Distribution), Sankarankovil, Tirunelveli District.

3)S.Krishnan ... Respondents Petition filed under Article 226 of the Constitution of India, praying for the issuance of a Writ of Mandamus, directing the Respondent No.1 and 2 to realign the electricity power line to the home of Respondent No.3 to alternative way away from petitioners home within the time stipulated by this Honourable Court. For Petitioner : Mr.T.Lajapathi Roy For R1 & R2 : Mr.G.Kasinatha Durai For R3 : Mr.J.Senthil Kumar

ORDER

Though the prayer in this writ petition is for issuance of a Writ of Mandamus, directing the Respondents 1 and 2 to realign the electricity power line to the home of Respondent No.3 to alternative way away from petitioner's home within a time frame, when the matter came up for hearing, learned counsel for the petitioner would submit that it is suffice, if a direction is issued to the respondents 1 and 2 to consider the representation of the petitioner dated 04.07.2015 seeking the abovesaid prayer, and to pass orders, within a time frame.

2.In view of the limited relief sought for, this Writ Petition is disposed of directing the respondents 1 and 2 to consider the representation of the petitioner dated 04.07.2015, seeking to realign the electricity power line to the home of Respondent No.3 https://hcservices.ecourts.gov.in/hcservices/

to alternative way away from petitioner's home, and to pass orders in accordance with law, if there are no legal impediments and after hearing the 3rd respondent, within a period of one month preferably on or before 05.03.2017. No costs. Sd/- Assistant Registrar (RTI) /True copy/ Sub Assistant Registrar To 1)The Executive Engineer, O/o. of Tamilnadu Generation and Distribution Corporation Limited(TNGEDCO), Sankarankovil, Tirunelveli District.

2)The Assistant Engineer, O/o. of Tamilnadu Generation and Distribution Corporation Limited(TNGEDCO) (Distribution), Sankarankovil, Tirunelveli District.

+1 CC to M/s.G.KASINATHA DURAI, Advocate, SR No. 3936. +1 CC to M/s.T.LAJAPATHY ROY, Advocate, SR No. 3659 NBI PSM/BS/08.02.2017/2P/5C W.P(MD)No.15972 of 2015 23.01.2017 https://hcservices.ecourts.gov.in/hcservices/