← Library
Madras High CourtWP(MD)/82/2019dismissed as infructuous

G.Sabudoss, v. The Chairman,

2021-09-20Honourable Mr Justice D. Krishnakumar4 pages

BEFORE THE MADURAI BENCH OF MADRAS HIGH COURT DATED : 20.09.2021

CORAM

THE HONOURABLE MR.JUSTICE D.KRISHNAKUMAR and W.M.P(MD)Nos.53 & 54, 4730 of 2019 G.Sabudoss ... Petitioner Vs.

1.The Chairman, Tamilnadu Electricity Board, N.P.K.R.R.Maligai, Chennai - 2.

2.The Chief Engineer, (Personnel), (TANGEDCO), 144, Anna Salai, Chennai - 2.

3.The Chief Engineer, (Distribution), (TANGEDCO), Tennur, Trichy.

4.The Superintending Engineer, (TANGEDCO), Trichy Electricity Distribution Circle/ Metro/Trichy, Mannarpuram, Trichy - 620 020.

5.The Executive Engineer, Operation and Maintenance/Urban/Thennur (TANGEDCO), Thennur, Trichy - 620 017.

1/4

6.The Assistant Executive Engineer, Operation and Maintenance, (TANGEDCO), Rock Fort, Trichy - 17.

7.The Assistant Engineer, Operation and Maintenance, (TANGEDCO), Rock Fort, Trichy - 17.

8.The Assistant Engineer, Operation and Maintenance, (TANGEDCO), Valadi, Lalgudi Tk, Trichy Dt.

... Respondents Prayer : Writ Petition filed under Article 226 of the Constitution of India, praying this Court to issue a Writ of Certiorari, to call for the records of the 2nd respondent Chief Engineer,/Personnel, TANGEDCO, 144, Anna Salai, Chennai - 600 002, vide its 2nd transfer order Memo.No.078460/1361/G42/G422/2018-1 dt.06.10.2018 issued to the petitioner through the 8th respondent Assistant Engineer, Operation and Maintenance, The Tamilnadu Generation and Distribution Corporation Limited, (TANGEDCO), Valadi, Lalgudi, Trichy District on 10.10.2018 and quash the same.

For Petitioner : Mr.DR.R.Rajagopal For Respondents : Mr.T.Sakthi Kumaran, Standing Counsel for State.

ORDER

Today, when the matter is taken up for hearing, the learned counsel appearing on either side have made a statement before this Court that pursuant to the interim order passed by this Court, pending writ petition, the third respondent has cancelled the impugned transfer order.

2.The above statement of the learned counsels has been recorded.

3.In view of the above, nothing survives for adjudication in 2/4

this Writ petition. Therefore, this Writ Petition is dismissed as having become infructuous. No costs. Consequently, connected miscellaneous petitions are closed.

Sd/- Assistant Registrar (P&A) // True Copy // / /2021 Sub Assistant Registrar(CS) dn Note : In view of the present lock down owing to COVID-19 pandemic, a web copy of the order may be utilized for official purposes, but, ensuring that the copy of the order that is presented is the correct copy, shall be the responsibility of the advocate/litigant concerned.

To 1.The Chairman, Tamilnadu Electricity Board, N.P.K.R.R.Maligai, Chennai - 2.

2.The Chief Engineer, (Personnel), (TANGEDCO), 144, Anna Salai, Chennai - 2.

3.The Chief Engineer, (Distribution), (TANGEDCO), Tennur, Trichy.

4.The Superintending Engineer, (TANGEDCO), Trichy Electricity Distribution Circle/ Metro/Trichy, Mannarpuram, Trichy - 620 020.

5.The Executive Engineer, Operation and Maintenance/Urban/Thennur (TANGEDCO), Thennur, Trichy - 620 017.

3/4

6.The Assistant Executive Engineer, Operation and Maintenance, (TANGEDCO), Rock Fort, Trichy - 17.

7.The Assistant Engineer, Operation and Maintenance, (TANGEDCO), Rock Fort, Trichy - 17.

8.The Assistant Engineer, Operation and Maintenance, (TANGEDCO), Valadi, Lalgudi. Tk, Trichy Dt.

+2 CC to M/s.Dr.R.RAJAGOPAL, Advocate ( SR-29810[F] dated 21/09/2021 ) +1 CC to M/s.T.SAKTHI KUMARAN, Advocate ( SR-29628[F] dated 21/09/2021 ) 20.09.2021 RD(12.10.2021) 4P 12C 4/4