S.Aruna v. The Project Director
BEFORE THE MADURAI BENCH OF MADRAS HIGH COURT DATED: 03-06-2026
CORAM
THE HONOURABLE MR.JUSTICE HEMANT CHANDANGOUDAR W.P(MD) No. 14229 of 2025 and W.M.P(MD)Nos.10449 and 10451 of 2025 S.Aruna Petitioner(s) Vs The Project Director, District Rural Development Agency, Tirunelveli.
Respondent(s) Prayer:Writ Petition filed under Article 226 of the Constitution of India, praying this Court to issue a Writ of Certiorarified Mandamus by calling for the entire records pertaining to the impugned corrigendum issued by the respondent vide his proceedings in No.A4/3236586/2025 signed on 05.05.2025 in connection with the E-Tender called for by him under a Package No.11/MGSMT 2025-26 and quash the same and consequently direct the respondent to proceed with the tender process strictly in adherence with the terms and conditions referred to in the above said tender notice and to proceed the same in accordance with law. 1/4
For Petitioner(s) : Mr.R.Anand for Mr.P.Saravanan For Respondent(s) : Mr.M.Mahaboob Athiff Government Advocate
ORDER
The petitioner challenges the impugned corrigendum dated 05.05.2025 issued by the first respondent whereby a condition was prescribed for qualifying the technical bid that the bidder have own Central Hot Mixing Plant. The tender notification dated 16.05.2025 and the tender period is valid for six months and as of today, the tender period has expired. Therefore, nothing survives for further adjudication in this petition.
2. Accordingly this Writ Petition is dismissed as infructuous. No Costs. Consequently, connected miscellaneous petitions are closed. 03-06-2026 Index :Yes / No NCC :Yes / No PJL 2/4