← Library
Madras High CourtWP(MD)/17973/2017disposed of

A.S.Gnanasaker v. The District Collector,

2017-09-21Honourable Mr Justice K.K. Sasidharan,Honourable Mr Justice G.R.Swaminathan3 pages

BEFORE THE MADURAI BENCH OF MADRAS HIGH COURT DATED: 21.09.2017

CORAM:

THE HONOURABLE MR.JUSTICE K.K.SASIDHARAN and THE HONOURABLE MR.JUSTICE G.R.SWAMINATHAN W.P.(MD)No.17973 of 2017 and W.M.P.(MD)No.14486 of 2017 A.S.Gnanasaker ... Petitioner Vs.

1. The District Collector, The District Collector Office, Kokarakulam, Tirunelveli.

2. The Regional Transport Officer, Regional Transport Office, Tirunelveli.

3. The Executive Engineer, State Highways Department, Tirunelveli District, Tirunelvlei.

4. The Thasildar, Rathapuram, Tirunelveli District.

... Respondents PRAYER: Petition filed under Article 226 of the Constitution of India praying to issue a Writ of Mandamus, directing the respondents No.1,3,4 to established the bus shelter at the present bus stopping stage at T.B.Road, KamarajNagar, Vallioor and Consequently to forbear the respondents No.3,4 from putting up bus shelter in a faraway from the ear mark area pass. For Petitioner : Mr.V.Balasubramanian For Respondents : Mr.T.S.Mohammed Mohideen Additional Government Pleader

O R D E R

*********** [Order of the Court was made by G.R.SWAMINATHAN, J.] The petitioner herein is a practising advocate. He is also the President of Kamaraj Nagar Kudierupor Sangam, Kamaraj Nagar, T.B.Road, Vallioor, Tirunelveli. There was no bus stop in that area. With great difficulty, they managed to get a bus stop at T.B.road, Kamaraj Nagar.

2.The Second respondent issued proceedings dated 08.08.2009 in this regard. Even though the bus stop was directed to be located and would also be formally opened, instead at present, a bus shelther is being put up at a different place and that is far away from the existing bus stop. Therefore, the present writ petition has been filed for forbearing the authorities from putting up the bus shelter at a far away place. 3.We are of the view that direction can be given for considering the representation dated 14.09.2017 submitted by the writ petitioner. When a bus stop has been located in T.B road, obviously there has to be a bus shelter also. Hence this Court directs the first respondent to consider the representation dated 14.09.2017 submitted by the writ petitioner in accordance with law and pass appropriate orders within a period of two months from the date of receipt of a copy of this order.

4.With the above observation, the writ petition is disposed of. No costs. Consequently, connected miscellaneous petition is closed.

Sd/- Assistant Registrar /True Copy/ Sub Assistant Registrar To

1. The District Collector, .The District Collector Office, Kokarakulam, Tirunelveli.

2. The Regional Transport Officer, Regional Transport Office, Tirunelveli.

3. The Executive Engineer, State Highways Department, Tirunelveli District, Tirunelvlei.

4. The Thasildar, Rathapuram, Tirunelveli District.

+1cc to V.Balasubramanian, Advocate Sr.No.80286 +1cc to The Spl.Government Pleader Sr.No.80964 RMI VB/SKN/RSK/SAR1/25/10/2017/3P/7C ORDER MADE IN W.P.(MD)No.17973 of 2017 21.09.2017