1 W.P.(MD)NO.16512 OF 2022 BEFORE THE MADURAI BENCH OF MADRAS HIGH COURT DATED: 27.01.2023

CORAM

THE HONOURABLE MR.JUSTICE G.R.SWAMINATHAN W.P.(MD)No.16512 of 2022 and W.M.P.(MD)No.11936 of 2022 C.Karthikeyan ... Petitioner Vs.

1. The Superintending Engineer, TANGEDCO Ltd., Virudhunagar Electricity Distributor Circle, Virudhunagar.

2. The Executive Engineer, Operation and Maintenance, TANGEDCO Ltd., Sivakasi.

3. The Assistant Executive Engineer, Operation and Maintenance, TANGEDCO Ltd., N.Subbayapuram,

4. The Assistant Engineer, Operation and Maintenance, TANGEDCO Ltd., Elayarampannai, ... Respondents Prayer: Writ petition is filed under Article 226 of the Constitution of India, to issue a Writ of Mandamus, forbearing the respondents from installing the poles and drawing high tension lines adjacent to petitioner quarry functioning in S. 1/4

2 W.P.(MD)NO.16512 OF 2022 No.419/1A and 419/1B, Kangarakottai Village, Sattur Taluk, For Petitioner : Mr.R.Murali For Respondents : Mr.S.Deenadhayalan, Standing Counsel.

* * *

O R D E R

The learned counsel appearing for the petitioner seeks leave to withdraw this petition and he has also made an endorsement to that effect.

2. This writ petition stands dismissed as withdrawn. No costs. Consequently, connected miscellaneous petition is closed.

27.01.2023 NCS : Yes / No Index : Yes / No Internet : Yes / No PMU 2/4

3 W.P.(MD)NO.16512 OF 2022 To:

1. The Superintending Engineer, TANGEDCO Ltd., Virudhunagar Electricity Distributor Circle, Virudhunagar.

2. The Executive Engineer, Operation and Maintenance, TANGEDCO Ltd., Sivakasi.

3. The Assistant Executive Engineer, Operation and Maintenance, TANGEDCO Ltd., N.Subbayapuram,

4. The Assistant Engineer, Operation and Maintenance, TANGEDCO Ltd., Elayarampannai, 3/4

4 W.P.(MD)NO.16512 OF 2022 G.R.SWAMINATHAN,J.

PMU W.P.(MD)No.16512 of 2022 27.01.2023 4/4