← Library
Madras High CourtWP(MD)/19767/2022dismissed

Srikandan .S v. The District Collector

2023-10-12Honourable Mr Justice G.R.Swaminathan5 pages

BEFORE THE MADURAI BENCH OF MADRAS HIGH COURT DATED : 12.10.2023

CORAM

THE HONOURABLE MR.JUSTICE G.R.SWAMINATHAN and W.M.P(MD)No.14422 of 2022 S.Srikandan ... Petitioner Vs.

1.The District Collector, District Collectorate, Office at Ramavarmapuram, K.P.Road, Nagercoil, 2.The Assitant Director of Village Panchayat, Collectorate Campus, Nagercoil, 3.The Superintending Engineer, TANGEDCO Distribution Circle, S.E.Office, Parvathipuram, Nagercoil, Kanyakumari District.

4.The Commissioner / Block Development Officer, Office at Kuruthancode, 1/5

6.The Junior Engineer, TANGEDCO Sub-division, Eraniel, Neyoor Post, 7.The President, Thalakulam Village Panchayat, Thalakulam, Thalakulam Post, ... Respondents Prayer : Writ Petition filed under Article 226 of the Constitution of India, praying this Court to issue a Writ of Certiorarified Mandamus, to call for the records pertaining to the order passed by the fourth respondent in Na.Ka.No.A5/191/2022 dated 14.07.2022 and quash the same as illegal and further direct the respondents 3 to 6 to reconnect / restore the electricity power supply to the high mass light and the two toilets in the Veluthambi Dalawa Memorial Building in Thalakulam, Thalakulam Panchayat, Kanyakumari District within a time stipulated. For Petitioner : Mr.K.P.Krishna Doss For Respondents : Mr.C.Satheesh Government Advocate for R.1 & R.2 Mr.S.Dheenadhayalan Standing Counsel for R.3 & R.5 Mr.N.Ramesh Government Advocate for R.4 & R.6 2/5

ORDER

Heard both sides.

2. The question that calls for consideration is whether the respondents were justified in disconnecting the supply of electricity for the petition mentioned memorial. The memorial is dedicated to a historical figure. But the fact remains that it is located on the private land. It is run by a private body. Therefore, some one must assume responsibility for paying the electricity consumption charges. If the petitioner is not ready to assume responsibility, he cannot demand that electricity supply should continue to be given. I do not find any ground to interfere.

3. This writ petition stands dismissed. There shall be no order as to costs. Consequently, connected miscellaneous petition is closed. 12.10.2023 NCC : Yes/No Index : Yes / No Internet : Yes/ No MGA 3/5

To 1.The District Collector, District Collectorate, Office at Ramavarmapuram, K.P.Road, Nagercoil, 2.The Assitant Director of Village Panchayat, Collectorate Campus, Nagercoil, 3.The Superintending Engineer, TANGEDCO Distribution Circle, S.E.Office, Parvathipuram, Nagercoil, Kanyakumari District.

4.The Commissioner / Block Development Officer, Office at Kuruthancode, 6.The Junior Engineer, TANGEDCO Sub-division, Eraniel, Neyoor Post, 4/5

G.R.SWAMINATHAN, J.

MGA and W.M.P(MD)No.14422 of 2022 12.10.2023 5/5