← Library
Madras High CourtWP(MD)/21367/2014withdrawn dismissed

P.Kandasamy, v. The Superintending Engineer,

2022-11-11Honourable Mr Justice R.Vijayakumar4 pages

BEFORE THE MADURAI BENCH OF MADRAS HIGH COURT DATED: 11.11.2022

CORAM

THE HON'BLE MR.JUSTICE R.VIJAYAKUMAR and M.P(MD)No.1 of 2014 P.Kandasamy ... Petitioner Vs.

1.The Superintending Engineer, Theni Electricity Distribution Circle, TANGEDCO, Theni Town & District.

2.The Executive Engineer (Distribution), TANGEDCO, Periyakulam, 3.The Assistant Executive Engineer (Distribution West), TANGEDCO, Periyakulam, 4.The Assistant Engineer (Distribution), TANGEDCO, Devathanapatti-625 602, Periyakulam Taluk, ... Respondents 1/4

PRAYER : Writ Petition filed under Article 226 of the Constitution of India, praying this Court to issue a Writ of Mandamus, forbearing the respondents from erecting any High Tension Power Line or Towers or causing damage in any manner to the petitioner's agricultural fields in Survey No.313 and 314/1 Genguvarpatti Village, Periyakulam Taluk, For Petitioner : Mr.N.Dilip Kumar For Respondents : Mr.S.Deena Dhayalan Standing Counsel

ORDER

The learned counsel for the petitioner seeks permission of this Court to withdraw the writ petition and also circulated a Memo, dated 11.11.2022. Recording the same, this Writ Petition is dismissed as withdrawn. No costs. Consequently, connected Miscellaneous Petition is closed.

11.11.2022 Index :

Yes / No Internet :

Yes / No gbg 2/4

To 1.The Superintending Engineer, Theni Electricity Distribution Circle, TANGEDCO, Theni Town & District.

2.The Executive Engineer (Distribution), TANGEDCO, Periyakulam, 3.The Assistant Executive Engineer (Distribution West), TANGEDCO, Periyakulam, 4.The Assistant Engineer (Distribution), TANGEDCO, Devathanapatti-625 602, Periyakulam Taluk, 3/4

R.

VIJAYAKUMAR ,J.

gbg Order made in Dated:

11.11.2022 4/4