Madras High CourtWP(MD)/22785/2021disposed of

Chinnakaruppan .P v. The District Collector

2023-11-22Honourable Mr Justice N. Anand Venkatesh5 pages

BEFORE THE MADURAI BENCH OF MADRAS HIGH COURT DATED : 22.11.2023 C O R A M THE HONOURABLE MR.JUSTICE N.ANAND VENKATESH P.Chinnakaruppan ... Petitioner -vs1.The District Collector, Madurai District, Madurai.

2.The Tahsildar, Madurai East Taluk, Y.Othakadai, Madurai.

3.The Assistant Executive Engineer, TANGEDCO, Melur, Madurai - 625 106.

4.The Assistant Engineer, TANGEDCO, Alagarkovil, Madurai - 625 301.

5.The Village Administrative Officer, Poigaikaraipatti, Madurai District.

6.S.Vellazhagi ... Respondents PRAYER: Writ Petition filed under Article 226 of the Constitution of India, to issue a Writ of Mandamus, directing the respondents 3 to 5 to provide free agricultural electricity service connection in the petitioner's name in the Punja Land, comprised in Survey No.22/11A, to an extent of 43 1⁄2 cents, situated at Poigaikaraipatti, Madurai East Taluk, Madurai District, by considering the petitioner's representation dated 22.11.2021. 1/5

For Petitioner :

Mr.K.Malaimaran For R1, R2 and R5:

Mr.R.Ragavendran Government Advocate For R3 and R4 :

Mr.S.Deenadhayalan Standing Counsel For R6 :

Mr.C.Gangai Amaran

ORDER

This Writ Petition has been filed for issuance of Writ of Mandamus, directing the respondents 3 to 5 to provide free agricultural electricity service connection to the petitioner, by considering the representation, dated 22.11.2021.

2. When the matter was taken up for hearing, the learned Standing Counsel appearing on behalf of the respondents 3 and 4 submitted that the representation made by the petitioner is already under consideration and that the respondents 3 and 4 are inclined to grant electricity service connection to the petitioner, provided that the petitioner submits all the relevant records before the fourth respondent.

2/5

3. In the light of the above submission, there shall be a direction to the petitioner to submit all the relevant records before the fourth respondent and on receipt of the same, the respondents 3 and 4 shall ensure that the electricity service connection is given to the petitioner.

4. The learned counsel appearing on behalf of the petitioner submitted that the petitioner has already reached the seniority and that the electricity service connection was not given due to some objections made. If the petitioner has already reached seniority, on receipt of the documents from the petitioner, the respondents 3 and 4 shall act upon the same and provide the service connection, within a period of four months from the date of receipt of a copy of this order.

5. This Writ Petition is disposed of with the above directions. No costs. NCC : Yes/No 22.11.2023 Index : Yes/No smn2 3/5

To 1.The District Collector, Madurai District, Madurai.

2.The Tahsildar, Madurai East Taluk, Y.Othakadai, Madurai.

3.The Assistant Executive Engineer, TANGEDCO, Melur, Madurai - 625 106.

4.The Assistant Engineer, TANGEDCO, Alagarkovil, Madurai - 625 301.

5.The Village Administrative Officer, Poigaikaraipatti, Madurai District.

4/5

N.ANAND VENKATESH, J.

smn2 22.11.2023 5/5