Madras High CourtWP(MD)/27388/2022disposed of

Sindha Muthar Kani .S v. The Asst Engineer (Distribution)

2022-12-02Honourable Mrs Justice V.Bhavani Subbaroyan4 pages

BEFORE THE MADURAI BENCH OF MADRAS HIGH COURT DATED : 02.12.2022

CORAM

THE HONOURABLE Mrs.JUSTICE V.BHAVANI SUBBAROYAN W.P. (MD) No.27388 of 2022 S.Sindha Muthar Kani ... Petitioner Vs.

1.The Assistant Engineer, (Distribution), TANGEDCO, Elumalai Town, Elumalai, Madurai District.

2.M.Diwan Mohaideen ... Respondents Prayer :- Petition filed under Article 226 of the Constitution of India praying for issuance of a Writ of Mandamus, to direct the first respondent to change the existing electricity tariff of the petitioner's building constructed in Survey No.604/2B1, Elumalai Village, Peraiyur Taluk, Madurai District from temporary connection to permanent / regular and additional load as per the provisions of the electricity rules, within a stipulated period that may be fixed by this Court.

For Petitioner : Mr.S.Siva Ilayaraja For R1 : Mr.S.Deenadhayalan, Standing Counsel

O R D E R

This Writ Petition has been filed for issuance of Writ of Mandamus, directing the first respondent to change the existing electricity tariff of the 1/4

petitioner's building constructed in Survey No.604/2B1, Elumalai Village, Peraiyur Taluk, Madurai District from temporary connection to permanent / regular and additional load, as per the provisions of the Electricity Rules.

2. By consent of both the parties, this writ petition is taken up for final disposal at the admission stage itself.

3. Heard Mr.S.Siva Ilayaraja, learned counsel for the petitioner, Mr.S.Deenadhayalan, learned Standing Counsel, who takes notice for the first respondent.

4. Considering the prayer sought for by the petitioner, this Court directs the petitioner to produce the Completion Certificate from the Panchayat Board, Tax Assessment Certificate and necessary documents before the first respondent within a period of two weeks from the date of receipt of a copy of this order and on receipt of the same, the first respondent is directed to change the existing electricity tariff of the petitioner's building constructed in Survey No.604/2B1, Elumalai Village, Peraiyur Taluk, Madurai District from temporary connection to permanent / regular and additional load, as per the provisions of the Electricity Rules, within a period of four weeks thereafter. 2/4

5. With the above directions, this Writ Petition is disposed of. No costs. 02.12.2022 Index : Yes/No Internet : Yes/No akv To 1.The Inspector General, Registration Department, No.100, Santhome High Road, Chennai-8.

2.The District Registrar, The District Registrar Office, Tirunelveli District.

3.The Sub Registrar, The Sub Registrar Office, Tirunelveli Joint-II, Tirunelveli District.

3/4

V.BHAVANI SUBBAROYAN, J.

akv Order made in W.P.(MD) No.27388 of 2022 02.12.2022 4/4