Madras High CourtWP(MD)/25971/2023disposed of

Sri Alagu Karupppar Blue Metal v. The Superintend Engineer

2023-11-06Honourable Mr Justice G.R.Swaminathan4 pages

1 W.P.(MD)NO.25971 OF 2023 BEFORE THE MADURAI BENCH OF MADRAS HIGH COURT DATED: 06.11.2023

CORAM

THE HONOURABLE MR.JUSTICE G.R.SWAMINATHAN W.P.(MD)No.25971 of 2023 AND W.M.P.(MD)No.22340 of 2023 Sri Alagu Karuppar Blue Metal, Rep. by Rm.Subbiah, S.F.No.543/3B, NA, Thulaiyanur Village, Thirumayam Taluk, Pudukkottai District.

... Petitioner Vs.

1. The Superintend Engineer, O/o.the Superintend Engineer, TANGEDCO, Pudukkottai Electricity Distribution Circle, Pudukkottai District.

2. The Executive Engineer, Operation & Maintenance, TANGEDCO, Thirumayam, Pudukkottai District.

3. The Assistant Executive Engineer, Operation & Maintenance, TANGEDCO, Thirumayam, Pudukkottai District.

... Respondents Prayer: Writ petition is filed under Article 226 of the Constitution of India, to issue a Writ of Mandamus, directing the respondent to provide additional load 550 HT in the 1/4

2 W.P.(MD)NO.25971 OF 2023 service connection No.SC-06-185-008-697, SC-06-185-008-878, SC-06-185-008-907 on the basis of the petitioner's application reference number 069094462609231341096 dated 26.09.2023.

For Petitioner : Mr.M.Rajarajan For Respondents : Mr.S.Deenadhayalan, Standing counsel.

* * *

O R D E R

Heard both sides.

2. The petitioner is running a Crusher unit. He seeks additional load. The stand of the respondents is that since one Jagaber Ali filed W.P.(MD)No.18274 of 2023, the petitioner's request could not be complied with.

3. The learned counsel appearing for the petitioner states that though an interim order was originally granted in the writ petition filed by Jagaber Ali, the same was subsequently vacated.

2/4

3 W.P.(MD)NO.25971 OF 2023

4. The fact remains that as on date, the writ petition is still pending and that there is no interim order granted therein. The respondents are directed to intimate Jagaber Ali about the petitioner's request. This communication will be sent immediately by the respondents. Breathing time of three weeks shall be given to Jagaber Ali to get any interim order. If he is unable to get any interim order in the pending writ petition, the respondents herein shall provide additional load as sought for, if the petitioner is otherwise entitled to. Usual formalities will have to be complied with. This writ petition stands disposed of. No costs. Consequently, connected miscellaneous petition is closed.

06.11.2023 NCC : Yes / No Index : Yes / No Internet : Yes / No PMU Note : Issue order copy on 09.11.2023 3/4

4 W.P.(MD)NO.25971 OF 2023 G.R.SWAMINATHAN,J.

PMU To:

1. The Superintend Engineer, O/o.the Superintend Engineer, TANGEDCO, Pudukkottai Electricity Distribution Circle, Pudukkottai District.

2. The Executive Engineer, Operation & Maintenance, TANGEDCO, Thirumayam, Pudukkottai District.

3. The Assistant Executive Engineer, Operation & Maintenance, TANGEDCO, Thirumayam, Pudukkottai District.

W.P.(MD)No.25971 of 2023 06.11.2023 4/4