BEFORE THE MADURAI BENCH OF MADRAS HIGH COURT DATED: 15.10.2025

CORAM

THE HONOURABLE MS.JUSTICE P.T.ASHA Writ Petition(MD)Nos.27066 and 25575 of 2025 and W.M.P(MD).Nos.21002 and 20024 of 2025 W.P(MD).No.27066 of 2025 A.Pravin George ... Petitioner Vs 1.The Tamil Nadu Power Distribution Corporation Ltd., rep., by its Chairman cum Managing Director, NPKRR Maaligai, No.144, Anna Salai, Chennai 600 002. 2.The Chief Engineer Distribution TNPDCL (formerly TANGEDCO) Arignar Anna Building, Maharaja Nagar, Tirunelveli 627011.

3.The Assistant Engineer, TNPDCL (formerly TANGEDCO), Perungudi EB Road, Vadankulam, Radhapuram Taluk, 4.S.Rajan ... Respondents Prayer: Writ Petition filed under Article 226 of the Constitution of India, praying this Court to issue a Writ of Certiorarified Mandamus, to call for the records relating to the impugned order of the third respondent dated 06.08.2025, quash the same and consequently direct the respondents 2 and 3 not to shift or erect any High Tension line (11 KV) on the northern side of Anna 1/6

Fathima Street II Lane, in front of the petitioner's residence at No.9/249A, Villakku, Kaval Kinaru Village Panchayat, Tirunelveli District. For Petitioner : Mr.J.Suresh For Respondents : Mr.S.Deenadhayalan Standing Counsel for R1 to R3 Mr.Vashik Ali (for R4) W.P(MD).No.25575 of 2025 A.Jesu Rajan ... Petitioner Vs 1.The Superintending Engineer, Tirunelveli Electricity Distribution Circle, TANGEDCO, Tirunelveli.

2.The Executive Engineer (Distribution), TANGEDCO, Vallioor, Tirunelveli District.

3.The Assistant Engineer(Distribution), TANGEDCO, Vadakkankulam, 4.The Deputy Superintendent of Police, 5.The Inspector of Police, Panagudi Police Station, 6.Pravin George ... Respondents Prayer: Writ Petition filed under Article 226 of the Constitution of India, praying this Court to issue a Writ of Mandamus directing the 1 to 3 respondents 2/6

herein to implement the shifting and deviation of HT/LT lines and poles at Kavalkinaru SS4/100KVA in 11 KV Radhapuram feeder fed from 110/11 KV Panagudi SS in Vadakkankulam section of Vallioor Division as per proceedings of the 1st respondent in the Memo NO.DR/TEDC/TIN/AEE/GL/AEII/SDM/F.DCW/D.NO.83/2025 dated 07.02.2025 and the consequential proceedings of the 3rd respondent in Ka.No./U.Me.Po/Vi/VADAVAI/Ko.PUGAAR/Ka.No.197/2025 dated 06.08.2025 by providing adequate police by the 4th and 5th respondents herein, with a time stipulated by this Court For Petitioner : Mr.V.Meenakshisundaram For Respondents : Mr.S.Deenadhayalan Standing Counsel for R1 to R3 Mr.S.

Prakash Government Advocate (for R4 & R5) COMMON ORDER When the matter came up for hearing, the learned Standing Counsel appearing for the TANGEDCO submitted that the existing low tension wire is not going to be disturbed and the only change occurs at the pole, which is shown near the building called 'AJK complex' as shown in the photograph annexed at page.No.97 in W.P(MD).No.25575 of 2025, where the low tension wire transitions into a high tension wire.

opposite side. It is assured that the high tension wire will not pass over any private property and will run only across the public road. The pole is going to be fixed only on the public pathway and not in front of the ingress or egress of any existing residential property. It is also stated that as the high tension wire is proposed to be fixed between the point AJK complex and the pole on the opposite side as depicted in pg no.97, the lines running on the three existing poles will be consolidated into the new pole, which will carry the high tension wire alone.

2. In the light of the statement made by the learned Standing Counsel appearing for the TANGEDCO, on instructions, this Court without going into the merits of the case has recorded the statement made by the learned Standing Counsel for TANGEDCO, and disposed of these writ petitions on the above lines. It is open to the Board to take necessary assistance from the local jurisdictional police in the event of any obstruction to their work. No costs. Consequently, connected Miscellaneous Petitions are closed. 15.10.2025 NCC : Yes/No Index : Yes/No Internet:Yes Rmk 4/6

To 1.The Chairman cum Managing Director, Tamil Nadu Power Distribution Corporation Ltd., NPKRR Maaligai, No.144, Anna Salai, Chennai 600 002. 2.The Chief Engineer Distribution TNPDCL (formerly TANGEDCO) Arignar Anna Building, Maharaja Nagar, Tirunelveli 627011.

3.The Assistant Engineer, TNPDCL (formerly TANGEDCO), Perungudi EB Road, Vadankulam, Radhapuram Taluk, 4.The Superintending Engineer, Tirunelveli Electricity Distribution Circle, TANGEDCO, Tirunelveli.

5.The Executive Engineer (Distribution), TANGEDCO, Vallioor, Tirunelveli District.

6.The Assistant Engineer(Distribution), TANGEDCO, Vadakkankulam, 7.The Deputy Superintendent of Police, 8.The Inspector of Police, Panagudi Police Station, 5/6

P.T.ASHA, J.