← Library
Madras High CourtWP(MD)/27466/2023disposed of

Murugesan.A v. The District Collector

2023-11-20Honourable Mr Justice G.R.Swaminathan4 pages

BEFORE THE MADURAI BENCH OF MADRAS HIGH COURT DATED : 20.11.2023

CORAM

THE HONOURABLE MR.JUSTICE G.R.SWAMINATHAN A.Murugesan ... Petitioner Vs.

1.The District Collector, Karur District, Karur.

2.The Inspector of Survey, O/o.Assistant Director Lands Survey & Record Department, Karur District.

3.The Tahsildar, Kadavur Taluk, Kadavur, Karur District.

4.The Taluk Deputy Inspector of Survey (Head Surveyor), Kadavur Taluk, Tharagampatty, Karur District.

... Respondents Prayer : Writ Petition filed under Article 226 of the Constitution of India, praying this Court to issue a Writ of Mandamus, to direct the Respondents No.1 to 3 to dispose of the Petitioner's Representation dated 22.08.2023 submitted for deletion of the new pathway entry in the FMB records thereby drawing pathway running from South to North touching upon the Eastern side of the 1/4

Petitioner's property comprised in Survey No.1162/2A measuring about 67 Cents situated at Sembianatham Village, Kadavur Taluk, Karur District within a time as fixed by this Court.

For Petitioner : Mr.B.Prahalad Ravi For Respondents : Mr.M.Siddharthan Additional Government Pleader

ORDER

Heard the learned counsel on either side.

2. The petitioner's case is that a non-existent pathway is being erroneously reflected in the petition mentioned FMB record. The petitioner seeks correction of the same. The petitioner is permitted to lodge an application before the jurisdictional Assistant Director of survey. As and when such application is received, a proper field enquiry shall be conducted and after notice to all the interested parties, final order shall be passed on merits and in accordance with law. This shall be done within a period of twelve weeks from the date of receipt of the application to be submitted by the petitioner. I make it clear that I have not gone into the merits of the matter.

3. The Writ Petition is disposed of accordingly. No costs. 20.11.2023 Index : Yes / No Internet : Yes/ No rmi 2/4

To 1.The District Collector, Karur District, Karur.

2.The Inspector of Survey, O/o.Assistant Director Lands Survey & Record Department, Karur District.

3.The Tahsildar, Kadavur Taluk, Kadavur, Karur District.

4.The Taluk Deputy Inspector of Survey (Head Surveyor), Kadavur Taluk, Tharagampatty, Karur District.

3/4

G.R.SWAMINATHAN, J.

rmi 20.11.2023 4/4