Chithra v. The District Collector
BEFORE THE MADURAI BENCH OF MADRAS HIGH COURT DATED: 04.03.2026
CORAM
THE HONOURABLE MR.JUSTICE HEMANT CHANDANGOUDAR Chithra ... Petitioner vs.
1.The District Collector, Trichy District, Trichy.
2.The Block Development Officer (Village Panchayat), Poovalur Panchayat, Lalgudi, Trichy District.
3.The President, Keelavaladi Village Panchayat, Lalgudi Taluk, Trichy District.
4.The Assistant Executive Engineer, Operation and Maintenance, TANGEDCO, Lalgudi, Trichy District.
5.The Junior Electrical Engineer, Operation and Maintenance, TANGEDCI, Valadi, Lalgudi Taluk, Trichy District.
6.J.Chitra ... Respondents 1/4
(R6 was impleaded vide order of this Court, dated 30.11.2023 in W.M.P. (MD)No.24114 of 2023) PRAYER: Writ Petition filed under Article 226 of the Constitution of India for issuance of Writ of Mandamus, to direct the respondents 4 and 5 to provide electricity service connection in the petitioner building constructed in Plot No. 1 and 2 of Pappammal Nagar comprised in Survey No.155A/1B2, Valadi Village, Lalagudi Taluk, Trichy District as per the Tamil Nadu Electricity Code and Regulations and that of the Terms and conditions of Supply of Electricity by considering the petitioner's representation dated 04.11.2023. For Petitioner :Mr.T.Leninkumar For R1 to R3 :Mr.P.Subbraraj Special Government Pleader For R4 and R5 :Mr.S.Deenadhayalan For R6 :Mr.R.Sundar *****
O R D E R
The learned Counsel for the petitioner seeks permission of this Court to withdraw this Writ Petition. He has also made an endorsement to that effect in the Court bundle. Permission is granted. 2/4
2.Recording the endorsement made by the learned Counsel for the petitioner, the Writ Petition is dismissed as withdrawn. No costs. Index :Yes / No 04.03.2026 Internet :Yes / No NCC :Yes / No cmr To 1.The District Collector, Trichy District, Trichy.
2.The Block Development Officer (Village Panchayat), Poovalur Panchayat, Lalgudi, Trichy District.
3/4
HEMANT CHANDANGOUDAR, J.
cmr 04.03.2026 4/4