BEFORE THE MADURAI BENCH OF MADRAS HIGH COURT DATED: 22.10.2025

CORAM

THE HONOURABLE MS.JUSTICE P.T.ASHA Writ Petition(MD)No.26223 of 2025 and W.M.P(MD).No.20424 of 2025 S.Pachaiyappan ... Petitioner Vs 1.The Chairman/ Managing Director, 144 Floor, NPKRR Maaligai, Chennai.

2.The District Collector, Karur District, Karur.

3.The Superintending Engineer, Electricity Distribution Circle, TNEB Complex, 3 Kovai Road, Karur District.

4.The Executive Engineer, Karur EDC, Karur District.

5.The Assistant Engineer, TANGEDCO Section Office, Thogaimalai, Kulithalai Taluk, Karur District.

6.Everrenew Energy Private Limited, Aneja Towers, B-Block, 1/5

2nd Floor, Perungudi, OMR Chennai 600 069.

... Respondents Prayer: Writ Petition filed under Article 226 of the Constitution of India, praying this Court to issue a Writ of Mandamus to direct the respondents 1 to 3 to prevent the respondents 4 to 6 from laying any electric line across the petitioner's land in S.Nos.340/2, 340/2C2, 374/2B, 375/1A, 375/1C, 375/2A, 375/2D, 375/3A and 375/4A at Naganur Village, Kulithalai Taluk, Karur District, based on the petitioner's representation dated 25.08.2025. For Petitioner : Mr.B.Prasanna Vinoth For Respondents : Mr.A.Kannan Additional Government Pleader (for R1 & R2) Mr.S.Deenadhayalan Standing Counsel (for R3 to R5) Mr.Jaishankar Ramakrishnan (for R6)

ORDER

This writ petition has been filed seeking for a Writ of Mandamus directing the respondents 1 to 3 to prevent the respondents 4 to 6 from laying any electric line across the petitioner's land in S.Nos.340/2, 340/2C2, 374/2B, 375/1A, 375/1C, 375/2A, 375/2D, 375/3A and 375/4A at Naganur Village, Kulithalai Taluk, Karur District, based on the petitioner's representation dated 25.08.2025.

2/5

2. The only grievance of the petitioner is that appropriate permission from the District Collector, namely, Enter upon permission has not been sought for by the sixth respondent under Section 164 of the Electricity Act, 2004, read with Section 12 of the Indian Telegraph Act, 1885. The sixth respondent shall therefore obtain such permission before laying the transmission line. It is open to the District Collector to fix the compensation payable to the petitioner, if any, in such event. The entire exercise shall be completed within a period of two months from the date of receipt of a copy of this order.

3. With the above direction, this Writ Petition is disposed of. No costs. Consequently, connected Miscellaneous Petition is closed. It is needless to say till such permission is obtained, line will not be drawn over the petitioner's land.

22.10.2025 NCC : Yes/No Index : Yes/No Internet:Yes Rmk To 1.The Chairman/ Managing Director, 144 Floor, NpKRR Maaligai, Chennai.

3/5

2.The District Collector, Karur District, Karur.

3.The Superintending Engineer, Electricity Distribution Circle, TNEB Complex, 3 Kovai Road, Karur District.

4.The Executive Engineer, Karur EDC, Karur District.

5.The Assistant Engineer, TANGEDCO Section Office, Thogaimalai, Kulithalai Taluk, Karur District.

4/5

P.T.ASHA, J.

Rmk Writ Petition(MD)No.26223 of 2025 22.10.2025 5/5