← Library
Madras High CourtWP(MD)/27397/2025closed

S.Sudalaimuthu, v. The Engineer In Chief And

2025-11-06Honourable Mr Justice K.Kumaresh Babu6 pages

BEFORE THE MADURAI BENCH OF MADRAS HIGH COURT Dated : 06/11/2025

CORAM

THE HONOURABLE MR. JUSTICE K.KUMARESH BABU and W.M.P(MD)Nos.21319, 21321 and 21322 of 2025 S.Sudalaimuthu ... Petitioner Vs

1. The Engineer in Chief And The Chief Engineer (General), PWD Department, Chepauk, Chennai 600 005.

2. The Superintending Engineer, PWD Department, Quality Control Circle, PWD, Chepauk, Chennai.

3. The Executive Engineer, Quality Control Division, PWD Department, Rani Mangammal Aranmanai 1 Floor, 45 Chithirai Street, Madurai.

4. The Assistant Executive Engineer, PWD Department, Quality Control Sub-Division,

5. The Assistant Executive Engineer, PWD Department, Quality Control Sub-Division, Tirunelveli.

6. The Commissioner,, Chennai.

1/6

7. The Joint Commissioner,

8. The Joint Commissioner, H.R. and C.E. Tirunelveli Zonal Office, Tirunelveli District.

... Respondents PRAYER :- Writ Petition, filed under Article 226 of the Constitution of India, praying this court to issue a Writ of Certiorarified Mandamus to call for the records connected with the impugned order in Letter No. S1 (1)/005161/2024-2 dated 30.07.2025 passed by the Respondent No.1 and quash the same, consequently direct the Respondent No. 1 to conduct fresh enquiry by complying the directions issued by this Honble Court in W.P(MD).No.15792/2025 in accordance with law within the time stipulated by this Court.

For Petitioner : Ms.A.V.Saha for Mr. Maharaja M, Advocate.

For Respondents : Mr.F.Deepak, for R1 to R5 Special Government Pleader Mr.P.Subburaj for R6 to R8 Special Government Pleader 2/6

ORDER

This Writ Petition is filed to issue a Writ of Certiorarified Mandamus to call for the records connected with the impugned order in Letter No. S1 (1)/005161/2024-2 dated 30.07.2025 passed by the Respondent No.1 and quash the same, consequently direct the Respondent No. 1 to conduct fresh enquiry by complying the directions issued by this Honble Court in W.P(MD).No.15792/2025 in accordance with law within the time stipulated by this Court.

2. When the matter was taken up for hearing, learned Special Government Pleader placed on record the proceedings of the first respondent herein which would indicate that the petitioner who had been transferred earlier to the Regional Joint Commissioner Office of HR & CE, Madurai was cancelled and he had now been posted to the office of Executive Engineer Technical (Building and Maintenance) Circle, Madurai, as earlier transfer order has now been recalled. 3/6

3. In view of the submission, the order impugned herein would no more survive and hence there is no necessity to adjudicate the writ petition any further and accordingly the writ petition stands closed. However, there shall be a direction to the petitioner to join in the said post within a period of one week from the date of issuance of the posting order failing which, the proceedings impugned in this writ petition shall be continued against the petitioner. No costs. Consequently, connected miscellaneous petition stands closed.

06.11.2025 NCC : yes / no Index : yes / no Internet : yes / no pnn 4/6

To

1. The Engineer in Chief And The Chief Engineer (General), PWD Department, Chepauk, Chennai 600 005.

2. The Superintending Engineer, PWD Department, Quality Control Circle, PWD, Chepauk, Chennai.

3. The Executive Engineer, Quality Control Division, PWD Department, Rani Mangammal Aranmanai 1 Floor, 45 Chithirai Street, Madurai.

4. The Assistant Executive Engineer, PWD Department, Quality Control Sub-Division,

5. The Assistant Executive Engineer, PWD Department, Quality Control Sub-Division, Tirunelveli.

6. The Commissioner,, Chennai.

7. The Joint Commissioner,

8. The Joint Commissioner, H.R. and C.E. Tirunelveli Zonal Office, Tirunelveli District.

5/6

K.KUMARESH BABU,J pnn

ORDER

IN and W.M.P(MD)Nos.21319, 21321 and 21322 of 2025 Date : 06/11/2025 6/6