High Court of KeralaWP(C)/4559/2007dismissed

Bhoopathi Steels Pvt.Ltd. v. Kerala State Electricity Board

2015-06-22Honourable Mr.Justice V.Chitambaresh4 pages

IN THE HIGH COURT OF KERALA AT ERNAKULAM

PRESENT:

THE HONOURABLE MR.JUSTICE V.CHITAMBARESH MONDAY, THE 22ND DAY OF JUNE 2015/1ST ASHADHA, 1937 WP(C).No. 4559 of 2007 (P) --------------------------- PETITIONER:

------------------ BHOOPATHI STEELS PVT.LTD., NEW INDUSTRIAL DEVELOPMENT AREA, KANJIKODE, PALAKKAD, REPRESENTED BY ITS MANAGING DIRECTOR B. RADHAKRISHNAN.

BY ADVS.SRI.K.SRIKUMAR SRI.K.MANOJ CHANDRAN RESPONDENTS:

----------------------

1. KERALA STATE ELECTRICITY BOARD, VYDYUTHI BHAVANAM, PATTOM PALACE, THIRUVANANTHAPURAM REPRESENTED BY ITS SECRETARY.

2. THE DEPUTY CHIEF ENGINEER, APTS (HQ), KERALA STATE ELECTRICITY BOARD, VYDYUTHI BHAVANAM, PATTOM PALACE, THIRUVANANTHAPURAM.

3. THE SPECIAL OFFICER (REVENUE) & THE ACCOUNTS OFFICER, O/O.THE SPECIAL OFFICER (REVENUE), KERALA STATE ELECTRICITY BOARD VYDYUTHI BHAVANAM, PATTOM PALACE, THIRUVANANTHAPURAM.

4. THE ASSISTANT EXECUTIVE ENGINEER, KSEB, APTS, VYDHYUTHI BHAVANAM, PATTOM, THIRUVANANTHAPURAM.

5. THE EXECUTIVE ENGINEER, KSEB, TMR DIVISION, SHORNUR.

R,R1 TO 5 BY ADV. SMT.P.K.RADHIKA-KSEB R BY SRI.JOSE J.MATHEIKEL, SC, KSEB THIS WRIT PETITION (CIVIL) HAVING BEEN FINALLY HEARD ON 22-06-2015, THE COURT ON THE SAME DAY DELIVERED THE FOLLOWING:

WP(C) NO. 4559/2007 APPENDIX PETITIONER(S) EXHIBITS EXHIBIT P1 :

TRUE COPY OF THE MAHAZAR DATED 18.01.2005 EXHIBIT P2 :

TRUE COPY OF THE INVOICE DT. 25.01.2005.

EXHIBIT P3 :

TRUE COPY OF THE COVERING LETTER DT. 25.01.2005. EXHIBIT P4 :

TRUE COPY OF THE APPEAL DATED 29.01.2005.

EXHIBIT P5 :

TRUE COPY OF THE ORDER DATED 30.01.2006.

EXHIBIT P6 :

TRUE COPY OF THE INVOICE DATED 28.02.2006.

EXHIBIT P7 :

TRUE COPY OF THE COVERING LETTER DT. 23.03.2006. EXHIBIT P8 :

TRUE COPY OF THE LETTER DATED 23.03.2006.

RESPONDENT(S) EXHIBITS : NIL /TRUE COPY/ P.A. TO JUDGE.

V. CHITAMBARESH, J -------------------------------- WP(C) NO. 4559 OF 2007 ------------------------------------ Dated this the 22nd day of June, 2015

JUDGMENT

The inspection was done on 18.01.2005 by the Anti Power Theft Squad along with the staff of the TMR division. The same revealed the following:

(i) The window glass of the meter box was found to be loose.

(ii) The covering place at the back side of TTB of the meter was found removed.

(iii) The installation of the wire leads from the CT was found to be tampered and exposed.

2.

The authorities have concurrently found that there has been a tampering of the meter in circuit. A full fledged inspection had earlier been conducted at 19.10.2004. It was therefore reasonable to hold that the power theft would have occurred at a later date in October, 2004. The appellate authority has also granted relief to the petitioner by charging one and half times instead of two times for the load above

WP(C) No. 4559/2007 contract demand.

3.

Much was argued on the point that the details of the inspection conducted on 15.01.2005 are not forthcoming. The same has been explained in the counter affidavit filed on behalf of the respondents. It is stated therein that the data downloaded on 15.01.2005 could not be retrieved due to software corruption. This was precisely why an inspection was done soon after on 18.01.2005 by the Anti Power Theft Squad and the staff of TMR division.

4.

Ext.P5 appellate order does not suffer from any infirmity warranting interference. The conclusions arrived at therein are based on evidence and attendent circumstances. The petitioner claims to have remitted more than the amount due. That is a matter to be looked into when future bills are being issued.

The Writ Petition is dismissed. No costs.

V. CHITAMBARESH JUDGE ncd