Asokan v. The District Geologist
IN THE HIGH COURT OF KERALA AT ERNAKULAM
PRESENT:
THE HONOURABLE MR.JUSTICE P.R.RAMACHANDRA MENON THURSDAY, THE 5TH DAY OF MARCH 2015/14TH PHALGUNA, 1936 WP(C).No. 7055 of 2015 (F) --------------------------- PETITIONER(S):
-------------------------- ASOKAN AGED 46 YEARS S/O.KRISHNANKUTTY, KUNNATH HOUSE, VANIYAMPARA PO PANANCHERY VILLAGE THRISSUR TALUK, THRISSUR DISTRICT BY ADV. SRI.P.M.ZIRAJ RESPONDENT(S):
----------------------------
1. THE DISTRICT GEOLOGIST DEPARTMENT OF MINING AND GEOLOGY THRISSUR DISTRICT 680001
2. THE DIRECTOR MINING AND GEOLOGY, OFFICE OF THE MINING AND GEOLOGY KESAVADASAPURAM, PATTAM, THIRUVANANTHAPURAM 695001
3. THE STATE OF KERALA REPRESENTED BY SECRETARY TO GOVERNMENT INDUSTRIES DEPARTMENT, GOVERNMENT OF KERALA GOVERNMENT SECRETARIAT, THIRUVANANTHAPURAM 695001 BY SRI JOSEPH GEORGE, GOVERNMENT PLEADER THIS WRIT PETITION (CIVIL) HAVING COME UP FOR ADMISSION ON 05-032015, THE COURT ON THE SAME DAY DELIVERED THE FOLLOWING:
WP(C).No. 7055 of 2015 (F) --------------------------- APPENDIX PETITIONER(S)' EXHIBITS ------------------------------------- P1:
COPY OF THE BUILDING PERMIT 28.02.2015 ISSUED BY THE SECRETARY, PANACHERY GRAMA PANCHAYATH P2:
COPY OF THE CERTIFICATE ISSUED BY THE ASSISTANT ENGINEER, LOCAL SELF GOVERNMENT DEPARTMENT SECTION, PANACHERY GRAMA PANCHAYATH DATED 28.02.2015 CERTIFYING THAT EXCAVATION AND REMOVAL OF EARTH IS REQUIRED FOR THE CONSTRUCTION OF PROPESED BUILDING P3:
COPY OF THE APPLICATION SUBMITTED BY THE PETITIONER BEFORE THE FIRST RESPONDENT DATED 02.03.2015 P4:
COPY OF THE JUDGENT OF THIS HONOURABLE COURT DATED 05.11.2014 IN WPC. NO.27596 OF 2014 P5:
COPY OF THE JUDGMENT OF THIS HONOURABLE COURT DATED 09.02.2015 IN WPC.NO.3979 OF 2015 RESPONDENT(S)' EXHIBITS: N I L --------------------------------------- //TRUE COPY// P.A. TO JUDGE JV
P.R. RAMACHANDRA MENON, J.
-------------------------------------------------- W.P.(C).No.7055 of 2015 --------------------------------------- Dated this the 5th day of March, 2015
JUDGMENT
The case of the petitioner is that, on the strength of Ext.P1 building permit, the petitioner levelled the property by removing ordinary earth for construction of a residential building. But when the petitioner approached the first respondent/ District Geologist with a request for issuance of Mineral Transit pass to transport the earth from his property, it was refused to be acted upon.
2. Heard the learned Government Pleader as well.
3. By virtue of Rule 14 of the Kerala Minor Mineral Concession Rules, 2015 the persons doing construction of residential building including flats or commercial buildings having a plinth area upto 300 square metres are exempted from obtaining quarrying permit under the Rules, if the owner of the land has obtained a prior valid permit for construction of such building from the concerned Local Self Government authority. The said Rules reads as follows:
W.P.C.No.7055 OF 2015 "14. Quarrying permit for Ordinary earth:
(1) A quarrying permit under these rules shall be obtained for extraction of ordinary earth used for filling or levelling purposes in construction of embankments, roads, railways or buildings in Form N:
(2) Notwithstanding anything contained in sub-rule (1), no quarrying permit is required under these rules for extraction of ordinary earth in connection with the construction of residential buildings including flats or commercial buildings having a plinth area of 300 square metres if the owner of the land obtained a prior valid permit for construction of such building from the Local Self Government authorities concerned;
Provided that in cases where transportation of ordinary earth is required, the owner shall pay royalty for the quantity to be transported and shall obtain mineral transit passes under the Kerala State Minerals (Prevention of illegal mining, storage and transportation) Rules, 2015 from the competent authority;
Provided further that the competent authority shall not issue mineral transit passes for removal of ordinary earth exceeding the quantity needed to be
W.P.C.No.7055 OF 2015 extracted, as ascertained by it through a site inspection."
4. In the above facts and circumstances, the first respondent/District Geologist is directed to issue 'Mineral Transit Pass' in Form O(A), on being satisfied with the genuineness of the claim of the petitioner based on Ext.P1 building permit, without insisting for 'NOC'/Mining permit; in accordance with law, which shall be done at the earliest at any rate within 'ten days' from the date of receipt of a copy of this judgment. The petitioner shall produce a copy of this judgment along with a copy of the writ petition before the first respondent/District Geologist for further steps. The number of vehicles need not be restricted, however the particulars of the vehicles shall be included in P Form to be issued to the petitioner.
The writ petition is disposed of.
SD/- P.R. RAMACHANDRA MENON, JUDGE jv